Project Nine Renewable Power Private ... vs Central Electricity Regulatory ... on 28 May, 2024

shifting of connectivity within the cluster/complex from older substation to new substation (reverse direction). If allowed, there will be constant demand for shifting ... same complex and under utilisation of such ISTS system besides squatting practices being indulged. Accordingly, shifting from later sub-station to an earlier substation
Appellate Tribunal For Electricity Cites 40 - Cited by 0 - Full Document

M/S Bhilangana Hydro Power Limited vs Uttarakhand Electricity Regulatory ... on 7 January, 2020

transmission system, if the generating plant cannot be connected to a transmission system how does it demonstrate generation capability, leave aside peaking capability. The entire ... upon the second Respondent to complete the transmission system within Scheduled COD, in order to shift onus of delay upon the Answering Respondent. 8.5 Learned
Appellate Tribunal For Electricity Cites 16 - Cited by 0 - Full Document