order dated 8.10.2018 the contract of the petitioner of soil testing has been cancelled and by another order dated 8.10.2018 it has been black listed ... writ petition) to appear before the Assistant Director, Soil Testing and Culture, Mordabad on 20.8.2018 with all documents. The notice does not indicate
National Mission for Sustainable Agriculture (N.M.S.A.) for testing of soil health and distribution of soil health cards.
4: The respondent ... process of 2017-18 for selection of firms for carrying out soil testing under N.M.S.A.
17: In response to the letter dated
late Biran Prasad Deo. Presently working as
Assistant Soil Chemist, Soil Test Laboratory, Sone Command Area
Development Agency, Khagaul, Patna, District - Patna
... ... Petitioner/s
Versus ... petitioner submits that from 21.07.2008, the petitioner has been
deputed at Soil Test Laboratory, Khagaul. Since then, he has
been discharging duties as Assistant Director
years, S/o Late Shri
Mohd. Ishhaque Khan, Agricultural Development Officer, Soil
Testing Laboratory, Bilaspur.
3. i. Yusuf Beg, aged about 60 years
Aster Infrastructure Pvt. Ltd. providing
services of survey site survey, soil testing, design & drawing, liasioning etc.
(v) Copies of sample invoices raised by Aster ... raised by Aster Infrastructure Pvt. Ltd. providing services
of site survey, soil testing, design & drawing, liasioning etc;
(v) Copies of sample invoices raised
land in question and found
that the government contractor was conducting soil testing for
construction of building for Engineering College and
Patna High Court CWJC
below.
5.1 Unsuitbale Soils for Construction:
5.1.1. Soils to be normally avoided are:
a) Organic clays, organic silts, peat, chalks, dispersive
soils, and poorly graded ... organic content in soil
vi) Crumb test, double hydrometer test, pin hole &
chemical test - for Dispersive soil only
vii) OMC/MDD
Fill material proposed
incurred
expenditure in marking the layout for proposed construction and conducting soil
tests. The petitioner further claimed that they had paid the third respondent
execution of Jorhat Water Supply
Scheme which included surveying of the soil, testing etc. on turnkey basis. The work order
was issued
handed over the the slum clearance board on 25.11.2017 and
thereafter, soil test was also done on 02.12.2017 and the land was
held suitable