independent inspection and assessment.
Typically, the owner or landlord has a structural audit report saying
the building is dangerous and must be pulled down ... Respondent appointed one Yogesh Patel to
carry out a structural audit. He made a report of 16th May 2011
saying that Wing B was ruinous
forwarding a copy of a
structural audit report. Even at that time the Society said that it was
in the process of redevelopment. About ... structural report of 5th
August 2022 of one Aaryan Consultants forwarded to the MCGM
on 17th August 2022. That structural audit report is addressed
forwarding a copy of a
structural audit report. Even at that time the Society said that it
was in the process of redevelopment. About ... structural report of
5th August 2022 of one Aaryan Consultants forwarded to the
MCGM on 17th August 2022. That structural audit report is
addressed
building requires substantial repairs. Mr Vanoo
submits that a structural audit was carried out in 2017-2018 when
the building was found ... Petitioners are members, obtained a "E"stage-managedW
structural audit report of 3rd June 2019 to show that the building
repaired for a long period
of time. There were structural audits. The members of the
Petitioner vacated the building in about July 2019.
Following this ... considerably. There then came to pass the usual
process of obtaining structural audit reports of the construction.
Ultimately these resulted in the second Respondent
13th September
2021, the 2nd Petitioner's structural consultant submitted a
Structural Audit Report. It had carried out all necessary tests. Its
conclusions were ... Thus, the Petitioners sought the assistance of the
statutory authorities. The Structural Audit Report was
communicated to the tenants/occupants as was the proposed
categorization
structure was still
occupied. Therefore, on 22nd May, 2015, the final call was issued.
The owners/tenants failed to carry out any structural audit ... structural audit report was ever submitted in terms of Section
353-B of the MMC Act. The structural audit is to be carried out
mandatorily
demolition,
Yasin Esmail has taken the contrary stand. Cherrysons
submitted a structural audit report to the MCGM and to its
Technical Advisory Committee ... require TAC to reconsider its opinion and to
obtain an independent structural audit report from any
reputed engineering college of its choice. The costs
demolition,
Yasin Esmail has taken the contrary stand. Cherrysons
submitted a structural audit report to the MCGM and to its
Technical Advisory Committee ... require TAC to reconsider its opinion and to
obtain an independent structural audit report from any
reputed engineering college of its choice. The costs
demolition,
Yasin Esmail has taken the contrary stand. Cherrysons
submitted a structural audit report to the MCGM and to its
Technical Advisory Committee ... require TAC to reconsider its opinion and to
obtain an independent structural audit report from any
reputed engineering college of its choice. The costs