structurally dilapidated or in the C-1 category
requiring them to be demolished and pulled down. They place
particular emphasis on a structural audit report ... categorized as C2-A, which indicated that
major structural repairs were called for. This structural
audit report was not objected to by the petitioners
within
independent inspection and assessment.
Typically, the owner or landlord has a structural audit report saying
the building is dangerous and must be pulled down ... Respondent appointed one Yogesh Patel to
carry out a structural audit. He made a report of 16th May 2011
saying that Wing B was ruinous
forwarding a copy of a
structural audit report. Even at that time the Society said that it was
in the process of redevelopment. About ... structural report of 5th
August 2022 of one Aaryan Consultants forwarded to the MCGM
on 17th August 2022. That structural audit report is addressed
forwarding a copy of a
structural audit report. Even at that time the Society said that it
was in the process of redevelopment. About ... structural report of
5th August 2022 of one Aaryan Consultants forwarded to the
MCGM on 17th August 2022. That structural audit report is
addressed
building requires substantial repairs. Mr Vanoo
submits that a structural audit was carried out in 2017-2018 when
the building was found ... Petitioners are members, obtained a "E"stage-managedW
structural audit report of 3rd June 2019 to show that the building
demolition, Yasin Esmail has taken the
contrary stand. Cherrysons submitted a structural audit report to
the MCGM and to its Technical Advisory Committee ... require TAC to reconsider its opinion and to obtain an
independent structural audit report from any reputed engineering
college of its choice. The costs
notice of 24 th
October, 2017, to have a structural audit of the building and
submit a report within seven (7) days. The petitioners prayed ... petition, a well known Institute in the
field of structural engineering carried out a structural audit. The
Veermata Jeejabai Technical Institute carried out that audit
repaired for a long period
of time. There were structural audits. The members of the
Petitioner vacated the building in about July 2019.
Following this ... considerably. There then came to pass the usual
process of obtaining structural audit reports of the construction.
Ultimately these resulted in the second Respondent
notice of 24 th
October, 2017, to have a structural audit of the building and
submit a report within seven (7) days. The petitioners prayed ... petition, a well known Institute in the
field of structural engineering carried out a structural audit. The
Veermata Jeejabai Technical Institute carried out that audit
13th September
2021, the 2nd Petitioner's structural consultant submitted a
Structural Audit Report. It had carried out all necessary tests. Its
conclusions were ... Thus, the Petitioners sought the assistance of the
statutory authorities. The Structural Audit Report was
communicated to the tenants/occupants as was the proposed
categorization