suit building through it's panel
structural Engineer on 16th July, 2015. As per the structural audit
report, the building was, therefore, declared ... hearing to the structural auditor appointed
by the appellants and also considered it's report. Having
considered the structural audit report submitted
known. It is
therefore recommended by the structural engineer to carry out the
structural audit for the entire wall of the larger property from Point ... receipt of the said structural report.
9. The Official Liquidator shall indicate the estimated
expenditure of the structural audit report to KPPL and Honest Shelters
Structural Auditor, Rehab
Consultants Pvt. Ltd. It is also stated that the structure for which
Mr.Anand Shah will get the structural audit done ... Dattatraya
Trading Company shall appoint a Structural Auditor and
have a structural audit conducted of the premises in their
occupation and submit the structural audit
short) for a
structural audit and a structural analysis of the said building.
The structural audit report dated 20 th August ... when all the structural
consultants/representatives of structural consultants
were present. In the meeting, structural audit reports of
all the structural consultants were taken into
Structural Consultants to enter upon and inspect the said
Flat, so as to enable them to thereafter prepare a Structural
Audit Report in respect thereof ... flat to ascertain the condition of
its structural stability and the extent of repairs required.
Structural audit and ascertaining of extent of repairs required
Appellant in 1930. The
first structure has 6 rooms, the second structure has 10 rooms and
the third structure has 9 rooms. There were about ... Appellant submits that, the structures
being interlinked, structural repair of any one structure would
affect the stability of the adjacent structure.
9. M/s. Manohar
aspects at page 321. The TAC
members have gone through the structural audit report submitted by
M/s. Rehab Consultants Pvt. Ltd., and noticed that ... they had
submitted Structural Audit Report on 30.04.2014, concluding the
building as repairable without conducting any test. Further as per
the conclusion of the structural
formalities and the Executive Engineer was also directed to prepare
structural audit of the building.
2. Thereafter on 31/10/2017 the petitioner filed Writ ... order dated 09/03/2017 by delivering
possession and conducting the structural audit. During pendency of the
writ petition, on 23/03/2018 a letter
Appellant in 1930. The
first structure has 6 rooms, the second structure has 10 rooms and
the third structure has 9 rooms. There were about ... Appellant submits that, the structures
being interlinked, structural repair of any one structure would
affect the stability of the adjacent structure.
9. M/s. Manohar
formalities and the Executive Engineer was also directed to prepare
structural audit of the building.
2. Thereafter on 31/10/2017 the petitioner filed Writ ... order dated 09/03/2017 by delivering
possession and conducting the structural audit. During pendency of the
writ petition, on 23/03/2018 a letter