tenants
2024.05.17
17:50:29
+0530
failed to submit structural audit report. On the contrary, our attention is
invited to the structural audit report ... under Section 354 is issued on 6 May 2024 consequent to structural
audit report of SPCE classifying the building in C-1 category
structure no.1,
and structure no.3 are ground foor structures and structure no.2 is
ground + one storeyed structure. While passing the order ... dated
04.08.2023, since the structure no.1 and structure no.3 are ground foor
structures, considering all aspects, the structural audit reports submitted
by VJTI
direction or order to Respondent No.5 to itself
conduct the structural audit of the Society in a time
bound manner;
b. Issue a writ ... commissioner, Gurugram.
18. Since the major issues pertaining to unsafe structure,
investigation and structural audit are already addressed and those
are to be taken
that the petitioners should also be directed
to carry out the structural audit.
4. Learned counsel for the petitioners submits that the landlord ... allowing them to carry out such a structural audit. He says
Page 1 of 2
01st July 2024
19-WP(L)-17902-2024.DOCX
that
dated 23rd October, 2019.
Reliance placed by the petitioners on the structural audit report
of 'Z' Consultants dated 9th July, 2018 is stated ... misplaced
as the said structural audit has not been properly carried out
and, in any event, the said report was valid for 12 months
dated 23rd October, 2019.
Reliance placed by the petitioners on the structural audit report
of 'Z' Consultants dated 9th July, 2018 is stated ... misplaced
as the said structural audit has not been properly carried out
and, in any event, the said report was valid for 12 months
13th September
2021, the 2nd Petitioner's structural consultant submitted a
Structural Audit Report. It had carried out all necessary tests. Its
conclusions were ... Thus, the Petitioners sought the assistance of the
statutory authorities. The Structural Audit Report was
communicated to the tenants/occupants as was the proposed
categorization
damage to the building.
l. Material on record indicates that a structural audit report was
undertaken by the IIT, Delhi using Partial, Non- Destructive
Tests ... Respondents pointing out the defects primarily
relying on the structural audit report of the IIT Delhi. Vide the
said Show Cause Notice, the Petitioner
above property and other similar
placed properties failed to submit the structural audit report inspite of
notice and reminder issued by the answering respondent ... Building Plan Sanctioned by DDA.
(ii) Allotment Letter by DDA.
(iii) Structural Audit Report comprising of seimic analysis and design with
asymmetrical plan
demolition,
Yasin Esmail has taken the contrary stand. Cherrysons
submitted a structural audit report to the MCGM and to its
Technical Advisory Committee ... require TAC to reconsider its opinion and to
obtain an independent structural audit report from any
reputed engineering college of its choice. The costs