safety systems. The design includes provisions for
withstanding external events like earthquake, tsunami/storm, tidal waves,
cyclones, shock waves, aircraft impact on main buildings ... seismicity, location of faults,
geology, foundation conditions, meteorology, potential of flooding (from
tsunami, storm surge etc. at coastal sites and from rain, upstream dam
break
respondent. The petitioner had to
postpone the date in view of the Tsunami tragedy and permission to hold the
meeting on a subsequent date ... Union Finance Minister with reference to the relief works for the Tsunami
victims and therefore, the Congress Party has the right and duty to explain
purpose of the acquisition as per
notification was for the rehabilitation of
Tsunami victims affected or likely to be
affected. According to the appellants ... cases
-:3:-
February, 2009 for rehabilitation of the people
affected in Tsunami attack happened on
26.12.2004. According to them, the District of
Kasaragode
Failure to assess and prepare for impact of cyclonic storms and tsunamis on the seawater intake structures for coolant and desalination;
xiii.Post facto issue ... been selected in a place which is not prone for earthquake or tsunami.
12.3. It is stated that worldwide there are 529 Atomic Power Stations
Leave granted.
2. The magnitude of the problem created by the Tsunami
which hit the Andaman and Nicobar Islands on 26th
December ... that were being faced by the Islanders in the wake of
the Tsunami and the steps that could be taken to mitigate
their sufferings
purpose of providing house sites to Tsunami affected victims dispensing with the enquiry under Section 5-A of the Act thereby the petitioners were deprived ... urgency in acquiring the lands for rehabilitation of victims of Tsunami at an early date; that Tsunami caused massive destruction on 26.12.2004, whereas, the respondents
matter of manufacture and supply of webbings to fishermen affected by Tsunami.
2. According to the petitioner ... webbings to be supplied to the fishermen affected by the Tsunami. Therefore, the Re-Tender Notification is vitiated by non-application of mind and arbitrariness
beyond 200 meters of HTL; considerable variation occurred on
account of tsunami and shoreline had changed subsequently,
which is beyond his control; in case ... years and no change was brought about in this
area due to tsunami and even the shores affected by tsunami
were restored by that time
which
the land is notified for acquisition is for implementing the tsunami
rehabilitation project. Ext.P1 is the notification under Section ... issue in the writ petition.
It is submitted that the devastating
Tsunami waves hit the coastal South India
including the coastal village of Kodungallur
further aver that on 11.3.2011, there was an earthquake followed by a Tsunami, at Fukushima Dai-ichi Plant in Japan, which resulted in evacuation ... India, New Delhi, and would submit that in the event of Tsunami or Earthquake, the spent fuel, which is being stored at MAPS, would