coal consumption,
average ash content, and annual ash generation as well as
annual ash slurry generation based on ash to water ration
power plants ... Capacity Total ash Total ash Relative Relative Share Share
Power Plant (MW) disposed in slurry share in share in in in
Ash Pond till disposed
towards Opacity Monitoring Equipment and Rs.
121.55 Cr. towards Ash Pond and Ash Handling System. The Central Commission
has merely stated that the projected capital ... capital
expenditures which are not of the specific nature such as Ash Pond, Ash Dyke and
Deferred Works, working as a result of change
bifurcated to account for the area occupied by
soil and pond ash for the determination of quantum of the embankment in two
different items ... respect of the different materials used, i.e. soil
and pond ash. Pertinently, it is not the case of the respondents that
closed trucks, while the unused Fly ash and Bottom ash are being
pumped to the Ash pond allotted to NCTPS / Stage - I in a slurry ... kept as standby. The ash pond consists of primary pond and
secondary pond. The collected wet ash is being taken out by private
people
ash generated by both the units from the
beginning of the production in the units, present quantity
stored in the ash ponds and quantity utilized ... ash is dredged, its removal shall be by the
respondents 2 and 3 and it shall be kept in a ash pond with
proper lining
capital cost of BOP package;
(c) Disallowance of site Grading and Ash Pond
Development costs;
(d) Disallowance of start up expenses;
(e) Disallowance of expenses ... package is not
correct.
( c ) Disallowance of Site Grading and Ash Pond Development
cost:
31. Mr. Ramachandran contended that in the order dated
April
fleet strength and it has proposed to dispose of the ash by creating ash ponds. At the first instance it was proposed to locate ... imposed thereafter.
2. Ash disposal: Out of the two alternatives suggested for ash disposal, the first alternative of providing ash pond in the nearby
independent assets like Ash Pond, Railway Siding, Water Intake System & Water Reservoir,
Coal Handling Plant, Switchyard etc. for each of the generating units
subsequent amendments shall be complied with.
xiii. As proposed, ash pond shall be lined with HDPE liner.
xiv. Third party evaluation/environment audit shall ... included public consultation.
However, to optimize the land requirement for the ash pond, in line with the
obligation to utilize 100% ash
ash/ash slurry
collection with over flow lagoon and Ash
Water Recirculation System (AWRS) to
reuse the water from ash pond in the
TPP.
Water ... being used for collection of ash slurry (wet ash).
7. That the legacy ash from these ponds are excavated and being
used by the NHAI