salesman in the Informant's firm i.e. M/s Biomass Research and Technical Solution Private Limited (hereinafter referred ... Biomass"); he along with his entire family members were involved in embezzlement of crores of rupees which have been collected in the shape
cases; (41) "Landed Fuel Cost" means the total cost of coal (including biomass in case of co-firing), lignite or the gas delivered ... components of the thermal generating station and includes integrated coal mine, biomass pellet handling system, pollution control system, effluent treatment plan, as may be required
Month
Maintenance Spares
%
Receivables
Month
Interest on WC
%
Form - 1.2: Template for (Biomass/MSW/RDF)
Sl. No.
Assumption Head
Sub-head
Sub-head (2)
Unit ... Kcal/kWh
GCA of Fossil Fuel (Coal)
Kcal/kWh
Biomass Price (fuel Type-1)/Yr 1
Rs./MT
Biomass Price (fuel Type
generator terminals of all the units of the generating station; (3) "Biomass" means wastes produced during agricultural and forestry operations (for example straws and stalks ... bushes/weeds; and the wood waste produced in some industrial operations; (4) "Biomass gasification" means a process of incomplete combustion of biomass resulting in production
appurtenant cost paid to the railway; (k) Capital expenditure on account of biomass handling equipment and facilities, for co-firing; (l) Capital expenditure on account
beneficiary shall be made at least three days in advance. (4) Where biomass fuel is used for blending with coal, the landed cost of biomass ... fuel shall be worked out based on the delivered cost of biomass at the unloading point of the generating station, inclusive of taxes and duties
Operation and Maintenance expenses. 18.2 The Working Capital requirement in respect of Biomass power projects with Rankine Cycle technology, Biogas, Biomass Gasifier based power projects
Solar Thermal Power Project. - Based on technologies approved by MNRE; (4) Biomass Gasifier based Power Project. - The project shall qualify to be termed ... biomass gasifier-based power project, if it is using new plant and machinery and having a Grid connected system that uses 100% producer gas engine
Commission for the following types of projects: (1) Solar Thermal; (2) Biomass Power Projects based on Rankine cycle Technology; (3) Biomass Gasifier based projects
Provided that in cases of Wind, Small Hydro project, Biomass power based on Rankine cycle, Solar PV with or without energy storage, Solar Thermal power ... projects, Biomass gasifier, Biogas power project, Municipal Solid Waste, Refuse derived fuel-based power projects, Cold Plasma Gasification projects and Tidal Wave power projects, these