BOT(Toll) basis.
Apart from construction cost along with interest, the
Concessionaire has to operate and maintain the project
highway at their cost till ... Point No. (iii), (iv) & (c):-Since it is a BOT project, the
expenditure being met from the equity of Concessionaire and
a group
during the inspection. I may be permitted such inspection."
The CPIO, Project Director vide letter dated 30.03.2024 replied as under:-
"1. NHAI ... Desired information not held with this office.
8. It is BOT Annuity Project.
9. Construction of the toll gate is in the scope of Concessionaire
other
document prohibiting such exemption."
The CPIO and CGM (Tech) and Project Director, NHAI, Solapur vide letter
dated 08.02.2023 replied as under:-
"Clarification ... concession agreement with respect to the particular fee plaza in
case BOT (Toll) projects.
(ii) Ministry of Road Transport and Highways vide National Highways
details are enclosed
as Annexure.
Regarding Concession Period, In case of BOT (Toll) Projects, the respective
Concessionaire will collect the user-fee upto ... will be carried out by NHAI.
In case of BOT (Annuity) and Public Funded Projects, user-fee collection is
carried out by NHAI duly engaging
Vijayawada National Highway:-
(a) "The requisition letter No. NHAI /PIU-HYD/BOT/ 2007/101 dt.
04.04.2007 sent to the RDO, Suryapet before vesting ... Durajapalli Village vide letter NHAI/PIU-HYD/BOT/2007/101 dt.
04.04.2007 by the Project Director, PIU, NHAI Hyderabad to the RDO,
Suryapet, united Nalgonda
completion of work
c. Nature of Project
d. Time period for the completion of project
e. Details of any extra work given ... pertaining to BOT package Indore to Kalghat Highway (if
any)
f. Any other general information related to the project.
However, no information shall be furnished
appellant in conformity with RTI Act
2005."
The PIO, Project Implementation Unit, NHAI vide letter dated 10.04.2023
furnished a point wise reply ... this is a BOT contract wherein the Concessionaire finance for
the development of the whole project, information such as work
order/purchase order
contractor
relating to the works under item 1 above."
The CPIO, Project Director, PIU-Tuticorin vide letter dated 29.03.2023 replied as
under ... working days.
2. The NH 45B (New No. NH 38) was under BOT contract. Hence, the
concessionaire was to plant and maintain
mentioned in the respective agreements. The copy of standard HAM, EPC &
BOT contract agreements are available in the MoRT&H website ... regulations in India.
3. The Service Roads are provided in the project highway as per the IRC
guidelines, such
mentioned in the respective agreements. The copy of standard HAM, EPC &
BOT contract agreements are available in the MoRT&H website ... regulations in India.
3. The Service Roads are provided in the project highway as per the IRC
guidelines, such