Krishnakumar for R10.
Official Present: Mr. K.N. Rajiv, Chief Engineer,
Projects, BWSSB.
Mr. C. Narayanswami, Addl. Chief Engineer,
Projects, BWSSB.
Page ... Rajiv, Chief Engineer of Bangalore Water Supply
and Sewerage Board (BWSSB) has appeared before us today
and explained in great detail that
happy with the report filed by the Chief
Engineer - BWSSB, as it states the sewage from the layouts can be
stopped in its entirety only ... time the UGSS is made
ready, it is the duty of the BWSSB to make a temporary arrangement
like the collection well and take
Committee under the Chairman of the Bangalore Water Supply
and Sewerage Board (BWSSB) was constituted and the report
dated 22.04.2025 is filed.
2. The Committee ... already having an existing STP and
there is no necessity for BWSSB and BBMP to lay the line
on the side of the Puttenahalli Lake
Bruhat Bengaluru Mahanagara Palike (BBMP), Bangalore
Water Supply and Sewerage Board (BWSSB) and Bangalore
Development Authority (BDA) along with the learned
counsel for Respondents ... line. If that is so, whether there is a necessity
for the BWSSB and BBMP to lay the line on the side of the
Puttenahalli
600meters has
commenced and the Bangalore Water Supply and Sewerage
Board (BWSSB) has stated in its report that of the 600meters,
317.5meters of pipeline ... pumping of it through the storm water drain by the
BWSSB contractors into the lake.
4. The learned counsel appearing for the BWSSB stoutly
denied
action taken by the Bengaluru Water Supply and
Sewerage Board (BWSSB) regarding the sewage generated in the
river catchment area is also mentioned ... treating capacity was 550 MLD. Presently, the BWSSB is
having 26 STPs with a capacity of 958.5 MLD and is treating
action taken by the Bengaluru Water Supply and
Sewerage Board (BWSSB) regarding the sewage generated in the
river catchment area is also mentioned ... treating capacity was 550 MLD. Presently, the BWSSB is
having 26 STPs with a capacity of 958.5 MLD and is treating
Vedhagirinath for R10.
Official Present: Mr. K.N. Rajiv, Chief Engineer, BWSSB and
Mr. H.S. Dayanand, Executive Engineer, BBMP.
Page 1 of 3
ORDER ... report dated 25.08.2025 of the Bangalore Water
Supply and Sewerage Board (BWSSB) is taken on file.
2. As per the report, the sewage originating from
However, in the report of the Bangalore Water
Supply and Sewerage Board (BWSSB) dated 24.11.2025, it is stated
that the team surveyed the entire ... main sewage line, is yet to be addressed by the
BWSSB, though it is stated to be underway. Once the said lateral
network connection
water is used by builders for construction
purposes. For this reason, the BWSSB issues partial
NOC to various residential and commercial projects in
respect