Dodsal Pvt. Ltd. vs Commissioner Of Central Excise on 21 October, 2005
Bangalore Water Supply and Sewerage Board, (herein after referred to as BWSSB). This required fabrication and laying clear water transmission main line of a total ... valves, expansion bellows etc.) as per the drawing and specifications provided by BWSSB. The entire project was covered by two contracts. W4B and W4C projects