that Jindal Power shall be allowed to draw power transmission lines from its existing power plant or from the proposed industrial power plant ... that Jindal Power has to secure license. Yet without securing the license Jindal Power commenced distribution of power. This attitude of Jindal Power has been
details of generation, auxiliary
consumption and consumption by captive and non-captive users
from all Captive Power Plants (CPPs) as the same ... which is claiming
status of a captive user. The Appellant has 100% of the ownership
of the Captive Power Plant and there is no issue
operation charges are to be
charged on the installed capacity of
Captive Power Plant which has to be
reckoned as the aggregate of the name ... current flows into
the grid and reduces stress on the captive
generator.
(iv) Captive Power Plants have higher fault
level support when they are running
Captive Power Plant. The power generated by the
respondent no. 2 was utilized for captive consumption
and the surplus power was sold to the Electricity ... power purchase rights in the
Distribution Company and making the Appellant a
representative of the State Government to purchase
power from captive generating plants
reduces stress on the captive generator.
Page 23 of 36
Appeal no. 39 of 2014
(iv) Captive Power Plants have higher fault level support when ... captive power
plant."
ii) This was also decided by the Tribunal in Chhattisgarh State
Power Distribution Co. Limited -v- Godawari Power & Ispat
from its
captive power plant for supplying powers to the
Appellant and on the other hand selling surplus
power from its captive power plant ... CSPDCL for supply of 50 MW Power while
claiming that there was no surplus power
available in its Captive Power Plant for supply to
consumers
Chattisgarh State Power Distribution ... vs Arasmeta Captive Power Co. Ltd on 24 February, 2011
Judgment in Appeal No. 25 of 2010
Before the Appellate Tribunal ... Raipur.
Represented by its Superintending
Engineer (RAC) ... Appellant
Versus
1. Arasmeta Captive Power Co. Ltd.
8-2-293/82/A/431/A, Road
Electricity Regulatory Commission dated 27th September, 2005, whereby every distribution licensee, captive power consumer, open access consumer and scheduled consumer have been directed to purchase ... what manner should the captive consumers be required to comply with the requirements, was not sufficient for directing the captive power consumers
captive and third party sources.
5.3 In accordance with order in SMP 1 of 2009, the HT
consumers made declaration in respect of captive power ... power plants
during the period of restrictions and control. The memo
specifies that the demand energy quota for HT consumers
partially using power from captive
operation charges on account of the alleged non--connectivity of
the captive power plant of the appellant to the grid of the respondent
Page ... herein. It also has a furnace fuel oil based on captive
power plant of 45 MW at Santej in order to meet its requirements