that the check meter installed by the Board
cannot be treated as a correct meter or replacement of
original meter. The check meter was installed ... treating the
check meter as an altered meter in place of the meter
installed earlier when on checking the meter the licensee
has found
existing meter unless and until its correctness is verified under the orders of the Court and in case of replacement, meter of the same company ... obtained an ex parte injunction restraining the Electricity Board from checking or replacing the meter by taking police help and to maintain status quo. Thereafter
treating the check meter as an altered meter in
place of the meter installed earlier when on checking the meter the licensee has found ... that check meter cannot be treated as an altered meter if the licensee intends to replace the defective meter by the check meter. It will
were also present and checking was carried out till 11:30 pm. i.e. for 12 hours. A Check Meter was installed whose reading ... that check meter cannot be treated as an altered meter if the licensee intends to replace the defective meter by the check meter. It will
security meter was provided on 8.9.2003. On 13.3.2004 respondents installed a check meter at the premises of the petitioner. On 13.3.2004 the respondents removed ... check meter and installed a new check meter. On 26.3.2004 the premises of the petitioner were checked by a raid team on which date
supply was disconnected. A check meter (fourth meter) was installed on 18,1,1995 which showed that the third meter supplied by the petitioner ... treating the check meter as an altered meter in place of the meter installed earlier when on checking the meter the licensee has found
regard. On 1.9.2001, the meter of the petitioner was
replaced by new meter. At the time of replacing the meter, panch
rojkam was made, however ... regards
manipulation or tampering with the meter or tampering with seals on
the meter, nor even the checking-sheet dated 7.2.2000 and the
rojkam dated
there had been detection of huge power loss in
terms of Check Meter installed at Ramgarh Sub-Station from
where electricity is being supplied ... dated 12-03-2015 in which it is held
that check meter installed outside the boundary wall of factory
accessible to general public
legal bar treating the check meter as an altered meter in place of the meter installed earlier when on checking the meter the licensee ... check meters cannot be treated as an altered meter if the licensee intends to replace the defective meter by the check meter. In the present
meter as well as main meter installed by the JBVNL.
It is further submitted that the JBVNL had installed main meter and main
metering unit ... metering unit
for bypassing the complete metering system installed by the JBVNL. The
inspection team took MRI data of the consumer's meter, check