have perused the checking report dated 21.10.2005. In
the checking report, it was mentioned that the removed meter be checked
from ... perused the checking report. It was mentioned in the
checking report that electric connection of A/c No. CF-27/1125 was
checked
case suspected theft of electricity is established through
tempering of meters/seals, then meter equipments are required to be taken
out from the premies ... seals
of the meter were found to be refixed with some adhesive material.
Thereafter working of the meter was also checked with applied load
about two hours in the restroom,
which is about 200 meters away from the check-post by
assigning his work to others, Anti Corruption Bureau ... sleeping in the rest room,
which is about 200 meters away from the check post, he was not
responsible for the alleged recovery of amount
Regulations, for supply of electricity energy to the consumers,
sealing of the meter in question was not, in any manner, within the duty
Civil Writ ... punishment order
would show that on checking report it has been found that the meter in
question was running slow
from the entrance gate. Therefore, in order
to check theft of energy, checking from grid sub station was the best
place to note violations ... enter the premises and to reach the meter installations.
The authenticity and accuracy of grid sub station meter cannot be
ANITA DEVI
doubted. The learned
meter was also installed at the
premises belongs to the petitioner. Premises of the petitioner
was checked by the officers of the respondent company ... using 65
HP load instead of contracted load of 40 HP. A checking
report was prepared in presence of the representative of the
petitioner
applicant for the post notified by Annexure A5 and
Annexure A6 check list.
2. The gist of the applicant's case is as under ... post of Engine Driver/Attendant/Lineman/Helper for
Lineman/Helper for Meter Testing/Mechanical
Fitter/Oilman/Mazdoor and similar grades in the Pay Band
Switzerlind for six
months' specialised training in power line carrier, tele-
metering and tele-control equipment in the modern power
system. On his return ... reliability and continuity in power supply which would
facilitate quick supervision and checking of the then
existing arrangements oil the generating stations receiving
sub-stations
Pragatisheel Nirman Sansthan had supplied 4434.654 cubic meter of
ballast out of which 600-700 cubic meter of ballast was lying in six
complete stacks ... execution of the contract and the respondent failed to
exercise proper checks on the quality of ballast and inadequate
supervision in loading of ballast into
admitted fact that prior to 1.4.1991, the work
relating to preparation and checking of water bills and
electricity bills was being carried out separately ... thereafter
that certain categories engaged in the task of water
distribution/meter reading etc. realized that disparity of pay
scales existed between these two categories