recording less than the units actually passing through it. A check meter affords an easy method of proving that the consumer's meter ... Some other tangible evidence must been shown to exist. An accu check meter can be deployed to find out if the meter is in fact
recording less
than the units actually passing through it. A check meter
affords an easy method of proving that the consumer's
meter ... Some other tangible evidence
must be shown to exist. An accu check meter can be
deployed to find out if the meter is in fact
recording less than the units actually passing through it. A check meter affords an easy method of proving that the consumer's meter ... Some other tangible evidence must be shown to exist. An accu check meter can be deployed to find out if the meter is in fact
recording less than the units actually passing through it. A check meter affords an easy method of proving that the consumer's meter ... corroborate what is detected on a physical examination. An accu check meter could have been used to detect if the meter was recording lesser energy
recording less than the units actually passing through it. A check meter affords an easy method of proving that the consumer's meter ... Some other tangible evidence must be shown to exist. An accu check meter can be deployed to find out if the meter is in fact
duty and obligation of the licensee to maintain and check the meter. If there is a default committed in this behalf by the licensee ... WHERE the Electricity Board unilaterally removed the meters and installed a check meter, on the ground that the meters in question were not recording
meter and thus, the electricity was being consumed directly
without routing it through the meter. There is no allegation
that the meter glass was found ... electricity led to the inference that
the meter was slow but the meter was not checked for accuracy
or defects nor were any material disclosed
electronic meter. It is alleged that as per Rule 57 of the Electric Supply Rules, 1956, the meter was required to be checked before installation ... meter purchased by the petitioner and that the unilateral act of the respondent in changing the electro mechanical meter and installing an electronic meter
come to take the meter reading. One of them
started checking the meter by his torch. She was standing there when he
caught hold ... told by someone that they had come to check the meter. She
informed her grandmother that some persons had come to check the meter.
When
every six months.
20. Meter complaints.- (i) Correctness of meter-
(a) Should the consumer dispute the accuracy of the meter, he may, upon giving notice ... basis of test results of the meter exceeds his contract demand.
(ii) Meter not recording-
(a) If the meter is not recording/stuck as reported