Meter terminal seal, meter half seals and hologram seals of
single phase electronic installed at the premises were found
tampered.
b) Meter was segregated ... performing the accuracy check with standard accu
check instrument meter was found 79.69 % slow.
Consumer did not allow the inspection team to proceed
further. Notice
they were employees of NDPL; those boys told
the complainant to check the meter and its load and accordingly
he went alongwith them to check ... checking the meter which
was installed on the ground floor of the flat. He further deposed
that he got the meter checked and those persons
output).
After segregation of the meter, accuracy check with accucheck
instrument and CMRI data of the meter was downloaded. There
is no reference ... this aspect. The tampering in the meter can
be proved by testing the meter in the laboratory. The meter in
question was tested in the laboratory
checked the working of the meter as there was no
electricity supply and meter was not checked on any other date
there after ... checked the
working of the meter as there was no electricity supply and
meter was not checked on any other date there after
meter glass and cover. No film was found inserted in the cavity
between the meter glass and cover when the meter was checked.
Suit ... recording less than the units
actually passing through it. A check meter affords
an easy method of proving that the consumer's
meter
NDPL employees and they told him that they have
come for checking his meter and they broke open the seals of the
meter and asked ... electricity meter; they had started
checking the electricity meter and while checking the meter they
had broke open the seals of the meter and told
checked the working of the meter as there was no
electricity supply and meter was not checked on any other date
there after ... checked the
working of the meter as there was no electricity supply and
meter was not checked on any other date there after
meter was checked.
The meter terminal seals were found intact. The accuracy of the meter
was checked with accucheck instrument. The meter was found slow ... three phase whole current electronic meter was installed in the name
of accused no.2. The meter was checked. The meter was not showing
phases
meter box seals found missing. Meter terminal seals
found missing. Load seal (left side) found tampered & not
disturbed. Working of meter found 57% slow ... site that meter was removed by TPDDL. No
document regarding removal of subject meter was shown to them.
Electricity of installed meter was being found
both the meters to
the police. He further stated that police took into possession the
meter checking apparatus from the accused persons and site plan ... search was also conducted. PW2 identified the case property i.e.
meter checking instrument as well as a tester which