Section 5 in The Energy Conservation Building Code Rules, 2018 [Entire Act]

building accompanied by - (a) the duly completed compliance forms together with check list of various components covered under rule (3) at the completion stage which ... power factor and power distribution losses; (vii) review the required check metering and monitoring system. (b) a list of the energy related building features
Union of India - Section Cites 0 - Cited by 0

Din Dayal Soni vs Dhbvnl on 12 February, 2018

parties that the electricity meter had become defective, the electricity meter was replaced. Thereafter, considering request of the complainant, check electricity meter was also installed ... meter and reading of the electricity meter already in existence regarding the same period was same. Not only this, after installation of the electricity check
State Consumer Disputes Redressal Commission Cites 1 - Cited by 0 - Full Document

Through vs . on 29 October, 2018

meter box seals found missing. Meter terminal seals found   missing.   Load   seal   (left   side)   found   tampered   &   not disturbed. Working of meter found ­57% slow ... site   that   meter   was   removed   by   TPDDL.   No document regarding removal of subject meter was shown to them. Electricity   of   installed   meter   was   being   found
Delhi District Court Cites 7 - Cited by 0 - Full Document

Madhya Gujarat Vij Company Ltd vs Saberabibi Mahmad Chhunga on 23 August, 2018

member of the checking squad which had carried out the checking of   the meter of the defendant. He has further admitted that ... checking   on   dated   24.07.2003   had   carried   out   the   checking   in   compliance   with   the   mandatory   provisions   laid   down   for   such   checking.   He   also   had  admitted   that
Gujarat High Court Cites 50 - Cited by 1 - J B Pardiwala - Full Document

Chhotabhai Budhabhai Khant vs Dy. Engeenier (South Zone) on 21 June, 2018

meter   was   conducted   at   Laboratory.   As   per   the   report   prepared by Laboratory, seals of meter were found broken and tapering   with the meter was found ... 01520/0   to the respondent. No meter number is mentioned therein. But, looking to   the meter number of checking report, it does not appear that
Gujarat High Court Cites 4 - Cited by 0 - J B Pardiwala - Full Document