building accompanied by - (a) the duly completed compliance forms together with check list of various components covered under rule (3) at the completion stage which ... power factor and power distribution losses; (vii) review the required check metering and monitoring system. (b) a list of the energy related building features
parties that the electricity meter had become defective, the electricity meter was replaced. Thereafter, considering request of the complainant, check electricity meter was also installed ... meter and reading of the electricity meter already in existence regarding the same period was same. Not only this, after installation of the electricity check
defective meter, the
meter was removed and packed in a cardboard with signature of consumer
and checking team and a new meter bearing No.0224901 ... checking, the plaintiff
refused to sign the checking report
Ex.D1/Ex.P3 and at the time of checking of
the meter
letter dated
15.05.2010.
4
(b) date of installing check meter at the premises of
the respondent and the date of removing the check
meter along ... wrongdoer, a check meter was also
installed, in addition to regular meter installed in respondent's
factory. The said check meter also recorded
Joint Electricity Regulatory Commission for the State of Goa and Union Territories (Connectivity and Open
Since the meter installed turned out to be defective, a new meter was installed on 30-12-2005. As the second meter installed was also ... meter at consumer's premises, the testing of meter shall be done for a minimum consumption of 1KWh. In case the meter is found
meter box seals found missing. Meter terminal seals
found missing. Load seal (left side) found tampered & not
disturbed. Working of meter found 57% slow ... site that meter was removed by TPDDL. No
document regarding removal of subject meter was shown to them.
Electricity of installed meter was being found
member of the checking squad which had carried out the checking of
the meter of the defendant. He has further admitted that ... checking on dated
24.07.2003 had carried out the checking in compliance with the
mandatory provisions laid down for such checking. He also had
admitted that
meter was conducted at Laboratory. As per the report
prepared by Laboratory, seals of meter were found broken and tapering
with the meter was found ... 01520/0
to the respondent. No meter number is mentioned therein. But, looking to
the meter number of checking report, it does not appear that
checking report. Moreover, the officers of the defendant
have broken the seal on the MMB and made internal
checking by applying accue check meter ... Looking to the said checking report, it appears
that consumption of the plaintiff was checked by
applying accue check meter. Moreover, during the
checking