mining of minerals with a lease area exceeding 50 hectares and
asbestos mining regardless of the mining area is classified as Category A; mining
with ... mining leases (5 hectares), the suggested lease period
(5 years), cluster mining, the necessity of a mining plan, the establishment of a
separate corpus fund
mining of minerals with a lease area exceeding 50 hectares and
asbestos mining regardless of the mining area is classified as Category A;
mining with ... Batch
(5 years), cluster mining, the necessity of a mining plan, the establishment of a
separate corpus fund for the reclamation and rehabilitation of mines
Ordinary earth’ mining projects with mining lease area
>=5 ha but < 25 ha and all other minor mineral mining projects with
mining lease area ... Notification, 2006. In such a case, mining operations in any of the mine
lease areas in the cluster will be allowed only if the environmental
sand
mining less than 5 hectares and (vii) River sand mining more than or equal to 5
hectares and below 25 hectares including cluster situations ... viii) River sand
mining clusters above 25 hectares.
47. Under the guideline dated 24.12.2013, category (iv), (v) and (viii) were
classified as B1 projects falling
riverbed mining:
(a) In the case of mining leases for riverbed sand mining, specific river stretches should be identified and mining permits/lease should ... under an approved framework of mining plan, which should provide for reclamation and rehabilitation of mined out areas. Mining plan should take note
M. Palanisamy vs The State Of Tamil Nadu on 19 June, 2012
Equivalent citations: AIR
under an approved framework of mining plan, which should
provide for reclamation and rehabilitation of mined out areas.
Mining Plan should take note ... without submitting the mining
plan. Under Rule 41 (8), a draft mining plan should contain the
following details.
8) The draft mining plan should contain
contained in the
chapter on “The Issues and Management of Mining in Cluster”:-
http://www.judis.nic.in “It is seen that the categorization ... clearance which is to ensure environmentally
sustainable and socially responsible mining. So if a cluster
or individual lease size exceeds 5 hectare
environmental aspects of mining of minor minerals
(quarrying as well as river beds mining) for their integration into the
mining process.
(ii) Specific safeguard measures ... adopting eco friendly scientific mining practices, (iii)
period of lease, (iv) cluster of mine approach for addressing and
implementing EMP in case of small mines
riverbed mining:
(a) In the case of mining leases for riverbed sand mining, specific river stretches should be identified and mining permits/lease should ... under an approved framework of mining plan, which should provide for reclamation and rehabilitation of mined out areas. Mining plan should take note