from supply of software are
from Siemens Limited and not from with CMRL, and therefore should not have
been taxed as receipts from alleged composite ... Persons (AOP) in respect of contract
with Chennai Metro Rail Corporation Limited (CMRL").
8. In the alternative and without prejudice to the above
Kumar,
Appeal No. ST/40046/2020 filed by Chennai Metro Rail Ltd.
(CMRL) and Appeal No. ST/40058/2020 is filed by Revenue and cross ... objection in Misc. Application No. 40366 of 2023 filed by the assessee
CMRL are against the impugned order passed by Commissioner of GST
and Central
Kumar,
Appeal No. ST/40046/2020 filed by Chennai Metro Rail Ltd.
(CMRL) and Appeal No. ST/40058/2020 is filed by Revenue and cross ... objection in Misc. Application No. 40366 of 2023 filed by the assessee
CMRL are against the impugned order passed by Commissioner of GST
and Central
Road, Chennai-10. In the said area the
Chennai Metro Rail Limited (CMRL) Phase-II, corridor-III is being
constructed.
2. The applicant has alleged ... above grounds, a direction is sought for to the CMRL and the
2nd respondent, Tata Project Limited, to stop forthwith all the
construction activity
Road, Chennai-10. In the said area the
Chennai Metro Rail Limited (CMRL) Phase-II, corridor-III is being
constructed.
2. The applicant has alleged ... above grounds, a direction is sought for to the CMRL and the
2nd respondent, Tata Project Limited, to stop forthwith all the
construction activity
Road, Chennai-10. In the said area the
Chennai Metro Rail Limited (CMRL) Phase-II, corridor-III is being
constructed.
2. The applicant has alleged ... above grounds, a direction is sought for to the CMRL and the
2nd respondent, Tata Project Limited, to stop forthwith all the
construction activity
present appeal.
According to the appellant, it is the advance payment CMRL made
on their behalf to the Proprietary Concern, which was encashed
even though ... project between CMRL and the appellant was
terminated. On the other hand, the respondent has attempted to
urge that there was no privity of contract
remediation
system was connected to the local power grid.
In 2017, CMRL started construction activity (Excavation of soil &
Extraction of groundwater) for the construction ... used for remediation. In October
2018, after many months of negotiation with CMRL, BPCL/Stratuswas
able to relocate the SVE unit and restart
month.
iv) The proposed metro excavation work by M/s.CMRL is going to
impact the existing SVE system including some of the monitoring ... operate the SVE system till the time of
commencement of M/s.CMRL work.
b) The SVE system may be operated round the clock against
members was awarded two
projects namely, Chennai Metro Rail Project ('CMRL') and Kolkata
2
I.T.A. No. 952/Del/2017 ... 2020.
East West Metro Rail Project ('KMRL'). Under the CMRL project, two
corridors with a combined length of 45 Kms. (partly underground