Search Results Page

Search Results

71 - 80 of 51046 (3.31 seconds)

WP(C)/2318/2019 on 29 May, 2024

year 2010, the petitioner industry had obtained an electricity connection with a connected load capacity of 77 KW. Since then, the petitioner industry has been ... electricity connection, the Inspection Team of the respondent authorities had inspected the unit of the petitioner industry on 30.08.2010 and found the connected load
Gauhati High Court Cites 21 - Cited by 0 - Full Document

WP(C)/1147/2015 on 29 May, 2024

year 2010, the petitioner industry had obtained an electricity connection with a connected load capacity of 77 KW. Since then, the petitioner industry has been ... electricity connection, the Inspection Team of the respondent authorities had inspected the unit of the petitioner industry on 30.08.2010 and found the connected load
Gauhati High Court Cites 21 - Cited by 0 - Full Document
Previous   4 5 6 7 8   9 10 11 12 13 Next