factor D as 152 x 24 hours
keeping connected load parameters i.e. factor A unchanged.
2.. Being
dissatisfied with the order passed ... petitioner and inspected the electrical installation. At
that time the connected load was found at 66.75 HP against the
contract load of 75 HP. During
which
is technically not possible looking to the load of the furnace and
the total load connected by the respondent No.1. Further, the meter ... which is technically not possible looking to the load
of the furnace and the total load connected by the respondent No.1.
Further, the meter
checking sheet, the total energy consumed with the connected load was
also examined.
4. Similarly, on
12th
August, 1998, the inspection had also taken place ... chargeability, connected
load is to be taken into consideration and not the actual load
supplied even if it is so connected, load
emphasize about the
actual load and submitted that the connected load was within the
permissible limit. He, therefore, submitted that the entire basis
proceeding ... connected load of 100 HP
against the contracted load of 75 HP, the petitioner is liable for
payment of the extra load which
said capacity is considered, the connected
load would not exceed the prescribed load for which the electricity
connection was granted. He therefore submitted that ... fact remains that
another compressor was already connected. Once the compressor was
connected, the capacity for connected load is to be counted
accordingly. Hence
petitioner further submitted that the checking sheet contains
finding qua connected load of 11.01 K.V., which on the face of it is
untenable ... there
should not have been any finding qua connecting load of 11 and odd
K.V.
5. Learned advocate
for the petitioner further submitted that
conclusion that there is no need to revise the connected load,
which is taken at 75 HP in the Supplementary Bill. Besides that
under LTP-1 category with contracted load
of 35 HP and connected load of 21 HP.
2 The present petition
is preferred under Article
taken into consideration, the load respectively
was 31.8, 22.0 and 21.3 and therefore it was contended that the
total load could not have been ... respondents for checking the load and load was 11.23
K.W., and at the same time, it finds that the connected load of the
petitioner
appeal that finding of
the checking squad qua consumption of load, based upon number of
motor, was also not justified, as one of the motor ... uncalled for or incorrect, however,
the Committee opined that the connection load, which is alleged to
have been of 15 HP should be treated