Dy.Engineer vs Sarovodaya on 7 September, 2011

respondent. The connected load was more than contracted load. There is no scope for re-calculation of the connected load. The checking sheet prepared ... meter, the fact that respondent had connected additional instruments so that there was additional connected load than the contracted load. Thus, admitted position
Gujarat High Court Cites 4 - Cited by 0 - Full Document

Executive vs Indian on 6 July, 2011

very less" on account of the connection made PDC or other reason and if the connected load is not found ... treat either the contract load or the load found by the Field Officer during last checking or the load mentioned in the last test report
Gujarat High Court Cites 1 - Cited by 0 - Full Document

Hind Plastic C/O.Rauk Haji Abdul vs Deputy Engineer on 24 April, 2014

theft of electrical  energy is clearly established against  the appellant.  The connected load was found at 71 HP  at the time of checking ... that  connected  load  is   mentioned  in   the  checking  sheet  with  necessary  break­up   of   machines.   Now   the  appellant   contended   that   that  connected load taken
Gujarat High Court Cites 2 - Cited by 0 - R M Chhaya - Full Document