builder's neglect. Residents also pointed out widespread
construction defects such as leakages, cracked plaster, uneven flooring, rusting
reinforcement bars, and poor-quality fittings ... Structural Defects Leakage from podium
05.06.2010, 09.06.2010; not rectified.
Pool remains non-functional; poor
2 Structural Defects Leakage in swimming pool
construction quality.______________
General leakage
builder's neglect. Residents also pointed out widespread
construction defects such as leakages, cracked plaster, uneven flooring, rusting
reinforcement bars, and poor-quality fittings ... Structural Defects Leakage from podium
05.06.2010, 09.06.2010; not rectified.
Pool remains non-functional; poor
2 Structural Defects Leakage in swimming pool
construction quality.______________
General leakage
entitled to recover Rs. 2,50,000/- on
account of construction defects left by the plaintiff / non-claimant in the
building, as prayed ... been argued by Ld. Counsel for the
defendant, that numerous construction defects exist in the premises,
including improperly erected brick walls, unstable pillars, poor
drainage
entitled to recover Rs. 2,50,000/- on
account of construction defects left by the plaintiff / non-claimant in the
building, as prayed ... been argued by Ld. Counsel for the
defendant, that numerous construction defects exist in the premises,
including improperly erected brick walls, unstable pillars, poor
drainage
likely to occur and this will not be treated as defect in construction. The DEVELOPER may repair the same at the cost of the PURCAHSERS ... defects which are bound to be noticed at the time of taking possession of the house. The complaint alleging such patent defects in the construction
building and that the
Developer has acted highhandedly without considering several
defects in construction pointed out by the members. Mr. Vashi,
has therefore submitted that ... structural
stability of Building C-1 as well as the alleged defects in
construction examined by an independent Architect appointed by
this Court
under:
(a) At page-6 of the agreement, "Construction Defects Liability
Period" is defined as a period of 12 months commencing from ... maintaining the existing roads.
(iv) To maintain the facility during the Construction Defects
Liability Period.
(e) At page-24, it is the appellant
cure all the defects noted in the letter.
However, respondent No.1 did not cure the defects of the
construction as well as fixtures ... defects in the construction. Even at that time also there
was no joint inspection of the construction to assess the
defects/short comings
cure all the defects noted in the letter.
However, respondent No.1 did not cure the defects of the
construction as well as fixtures ... defects in the construction. Even at that time also there
was no joint inspection of the construction to assess the
defects/short comings
defect is due to structural
engineering calculations, then
respondent has to pay compensation to
compensate the damage caused by
deficient construction.
The other part ... incurred towards the construction of the
Factory/wall. It is contended that, even assuming
that retaining wall fell due to alleged defective
structural design, Plaintiff