projects at cost plus basis to some Public Sector
Units(PSUs) and some private sector construction agencies during
financial year 2008-09 for implementation ... services through the Central and State
governments Public Sector Undertakings(PSUs) and reputed Private
Sector Construction Agencies on cost plus percentage basis(Project
Cost based
steel and increase the
intensity of steel usage, particularly in the construction sector and
other related activities. The intent in forming the respondent society ... develop and
propagate the effective usage of steel, particularly in the construction
sector. The same was intended to be achieved by bringing the steel
manufacturing
community buildings have been constructed/under construction by HUDA against EDC:
i)
Colleges:
1 No.
under
construction in Sector 9.
ii)
Hospital:
1 No.
hospital ... Sector 4
xiv) Police Station :
3 Nos.
constructed
(One in Sector 15-II, Sector 38 & Sector 29).
1 No.
in
Sector 56 under construction
order also does not give the developer any such right for
construction on Sector IV-A.
1 (2007) 9 SCC 220
::: Downloaded ... divided into various sectors and numbers
from Sector I to Sector XIII. Sometime in April 1990, a
separate layout plan for Sector
order also does not give the developer any such right for
construction on Sector IV-A.
1 (2007) 9 SCC 220
::: Downloaded ... divided into various sectors and numbers
from Sector I to Sector XIII. Sometime in April 1990, a
separate layout plan for Sector
steel and increase intensity of steel usage
particularly in the Construction sector and other related activities. The
initial registration of the Society was done ... other Association
interested in steel industry or steel usage or construction sector or in
any of the allied industries shall be eligible for admission
anxiety of the Executive to
ensure availability of materials for the
construction sector has apparently overtaken the
more fundamental requirement to provide adequate
WPC12150 ... difficult task. Therefore, though minerals and
raw materials are required for construction
sector, a meaningful balance has to be struck.
WPC12150
Power loom workers, Sugarcane migrant workers,
migrant workers engaged in the construction sector, Hazirabelt
migrant workers and workers engaged in the diamond industry
trade unions concerned with the rights of workers in the unorganized sector
including construction workers, especially in areas of safety, occupational
health and welfare measures ... legislation shall not go
waste. Otherwise the unorganized workers of the construction sector
will be denied the benefit of the Act.‖
33. Thereafter, on 18th
highways sector that 1
qualify under I Clause 2.2.2.6
(i)
2 Project in core sector that 0.70
qualify under Clause 2.2.2.6 (i)
3 Construction ... highways sector 1
that qualify under Clause
2.2.2.6(ii)
4 Construction in core sector that 0.70
qualify under Clause 2.2.2.6(ii)
3
(ii) The Technical