entrance
of the Red Fort as also a Cloak Room, leading to loss of revenue to the
petitioner.
7. In this manner, disputes arose between ... shuttle service, loss of revenue due to closure of the
parking, loss of revenue due to failure of the respondent to construct a
Cloak Room
however, went missing from the registry.
This seemingly was part of similar loss in more than one hundred such
criminal appeals, there have been reports ... backdrop, on
the basis of re-constructed record, it being conceded by both sides that
given the loss of the original record, there
THDC has filed counter claims against the
contractor Mis. Sai Constructions for the losses and
damages suffered by them owing to the gross delay ... site by
contractor, Loss due to non-shifting of Pratap Inter College
from Old Tehri Town and loss of goodwill. The amounts
claimed
THDC has filed counter claims against the
contractor Mis. Sai Constructions for the losses and
damages suffered by them owing to the gross delay ... site by
contractor, Loss due to non-shifting of Pratap Inter College
from Old Tehri Town and loss of goodwill. The amounts
claimed
Sitac Pvt Ltd vs Banwari Lal Sons Pvt Ltd & Ors on 2 July, 2019
security
deposit of Rs.1.5 lakhs and also awarded loss of profits for a sum of Rs.1.50
O.M.P. 235/2009 ... take advantage of its own wrong. The Contractor, having failed
to construct the exhibition halls under the first contract, cannot be allowed to
be benefit
Claim No.2 - Loss for a period of 32 months from the date of LOI
to CA for blocking of land: Finding the claim ... Claim No.5 - Loss due to reduction in dwelling units: Since
liability of reduction in scope of work for not constructing
financial loss to the
Government by wilful disobedience of Govt. orders."
20. The Tribunal accepted the plea of the Respondents regarding
constructive
facts and circumstances of this case, the Toll Plaza as
constructed is situate at Km 6 +572 metres.
18.3 If the decision of the Arbitral ... implemented, then
concededly, the second Toll Plaza will get constructed at Km 32.
18.4 The interpretation given by the Arbitral Tribunal to Clause 6.1 after
profit on the sale of the Floors as he was to construct four
floors with parking and lift, which he never completed & left ... Sneh Lata) got the construction
completed through contractor after incurring huge losses in the construction
project and it took her 3 years time