current density for HV & LV windings should not be more than 2.8 A/Sq.mm for copper conductor.
28.0 CURRENT TRANSFORMERS:
28.1 CTs shall ... cost of the Transformer or to withhold payment till Transformer is repaired.
...
SCHEDULE B
GUARANTEED TECHNICAL PARTICULARS FOR ENERGY EFFICIENT DISTRIBUTION TRANSFORMERS TO BE FURNISHED
Respondent discovered that Feeder No. 36 red phase of Current Transformer (hereinafter referred to as "CT") had become inter-turn short resulting ... dispute between the parties arose in connection with the Current Transformer which is a part and parcel of the meter; the dispute being
supply, at a given time, which
includes whole current meter and metering equipment, such as current
transformer, capacitor, voltage transformer or potential or voltage
::: Uploaded ... supply, in a given time, which includes whole
current meter and metering equipment, such as current
transformer, capacitor voltage transformer or potential or
voltage transformer
heading and in the said pit are located bus bar hangings, current transformer, cables lamp etc. The cables run from cooler pit to the adjacent ... short circuit in the bus bas and burning of the current transformer coils.
02. The fire might have got initiated by the breakage
warranted inasmuch as it is issued on the basis that Current Transformer Ratio (CTR) should have been 60/5A from 1-12-1983, whereas ... Current Transformer Ratio was fixed as 30/5A. According to the case of the petitioner the Current Transformer Ratio fixed earlier
also clear that according to the respondents there was defect in Current Transformer (C.T.), which resulted in the petitioner paying the consumption charges ... Atma Steels referred to above shows that the controversy whether current transformer (C.T.) & potential transformer (P.T.) are integral parts of the same
premises has two parts - (a) an
indoor part (consisting of Current Transformer and Potential
Transformer) and (b) an outdoor part (the CT Junction ... shorting wire to bypass the secondary
side of the current transformer (the outdoor part), thereby
causing the meter to register less energy. Therefore, the
replacement
confirmed that in Feeder No.36, the main Current Transformer
(CT) in Red phase had developed inter-turn short resulting in lower
output from ... While it was contended on behalf of the appellants that a
Current Transformer (C.T.) is not a "meter" within the meaning
appellants had been provided with metering equipment consisting of current transformers of the ratio of 40:5 on the basis of the appellants' then ... existing metering equipment viz. the current transformers having the ratio of 40:5 became inadequate to meet this revised maximum demand and it became necessary
applicant/plaintiff supplied to the respondent suspension insulators, potential transformers and current transformers covered under 17 individual purchase orders placed by the third defendant ... what relief ?
Points: The plaintiff supplied suspension insulators, potential transformers and current transformers covered under 17 individual purchase orders placed