plants through closed pipelines to a
confined area known as "Tailing Dam" which is located near to the ore
beneficiation plant. The tailing ... dam is constructed with the mine over-
burden and soil. The tailings in the slurry form are discharged to the
tailing dam wherein the solids
area served by an irrigation project such as
18
a canal, dam or a tank) and will also help in early sowing and harvesting ... Consulting Board was
constituted for advising on construction of dam, particularly, the design
and construction of Coffer dam and dewatering of foundation. Project
was found
Jaipur Gate, Shikarpura
Road, Diggi-Malpura Road, Muhana Road, Namdev Colony, Nevta Dam
and Brahmano Ki Gwar clusters and almost all were non-compliant.
CETP ... Jaipur Gate, Shikarpura
Road, Diggi-Malpura Road, Muhana Road, Namdev
Colony, Nevta dam and Brahmano Ki Gwar.
Major portion of industrial waste water from
till 1992. Later, the project was bifurcated into two components
Lakhwar Multipurpose Dam (300 MW) and Vyasi HEP (120 MW). A
1
separate Environmental Clearance ... Ullarakhand
State and being developed by UJVN Lid. The
construction of dam and underground power house for
Lakhwar Multipurpose Project (300 MW) is proposed
near
challenged the construction of the Hydro Electric Project or the dam or the EC granted by
the MOEF per se but has expressed his anxiety ... with regard to the safety and design of the dam,
its downstream effects on the ecology, the lives of the riparian tribal people residing
ground water with fresh water in the river. Further there is a dam
namely Nihara dam in village Nihara on river Bandi.
19. From Pali ... delay the proceedings for purification of the water stored in the
Nehara Dam;
ix) that the so called treated water in the eyes
ecological harm to environment; it is in fact a way
to dam lake and Rajakaluves within the project site, altering its natural
flow and spread ... permitted in ‗buffer zone' as it would,
in fact, account to damming and creating an embankment within such
‗buffer zone' but SEIAA, Karnataka
inter-alia in Narmada Bachao Andolan v. UOI & Ors. (Sardar
Sarovar Dam) 17 and N.D. Jayal & Anr. v. UOI & Ors. (Tehri ... Dam)18
25. In Narmada Bachao Andolan v. UOI & Ors. one of the objections
against the project was absence of proper EIA. The project
including construction of bridge, concrete in spill
channel and construction of Coffer dams should have been completed
by May, 2019. But all these works ... lagging behind. The main
Earth Cum Rock Fill Dam (ECRF) was scheduled to be completed by
the end of 2021. Meanwhile the entire work
M C Mehta vs Union Of India on 23 November, 2021
Author: Adarsh Kumar Goel