detection of
theft of electricity or the exact period of theft if determined,
whichever is less:
Provided further that period of theft of electricity shall ... data of the meter was downloaded. The action
of the Respondent is against the Regulation because as per this
regulation, the bill of theft
Amausi Industries Association & Ors vs Uttar Pradesh Electricity Regulatory ... on 28 November, 2013
Appeal
Commission had recorded that
"it is difficult to validate the above data submitted by MSEDCL in the absence of any
technical studies to verify ... starting point, which could be
refined based on availability of better quality data. The above submission by
MSEDCL clearly identifies commercial losses
improve voltage;
(v) Constitution of special dedicated teams for
arrears recovery and theft detection;
(vi) Regularization of Kundi connections in rural
areas;
(vii) Board level ... based consumer indexing and asset
mapping, AMR and SCADA System for data
acquisition under R-APDRP;
Page 23 of 54
Appeal
cost and that the appellant failed to provide the said revised data and the same was subsequently furnished by State Power Procurement Coordination Centre (SPPCC ... behalf of the appellants. He stated that in the said revised data, the quantum of power to be purchased has been increased
Kanan Devan Hill Plantations Company ... vs Kerala State Electricity Regulatory ... on 30 May, 2012
Appeal
M/S Aditya Industries (Partnership ... vs Himachal Pradesh Electricity ... on 9 September, 2015
Before the
current year based on the actual
data for the part of the year. When the requisite data was not
furnished by the Electricity Board ... blamed for estimating the same on the basis of
the available data. The State Commission has given detailed
explanation in paragraph 4.8.3 of the impugned
large
number of consumers being without meters coupled with large
scale theft of electricity the average cost of supply is 4.86 per kWH.
The Board ... loss in revenue for the Board. Coupled with
this instances of theft by powerful consumers also show a sorry
picture. The Commission had initially approved
appellant submitted that REL is in the process of providing the data with regard to technical losses for which MERC has given six months time ... commercial losses in the distribution system such as slow and sticky meters, theft of electricity etc. She emphasized that meters installed