sanction dated
07.08.2004. As per the Commencement Certificate issued under the dC
Rules, the CC permission is valid only for one year. Thereafter ... which
is totally illegal and in violation of DC Rules. The Project Proponent has
claimed net plot area to the extent of 11504.35 sq.mtrs
Project Proponent has not provided side margin as per the DC Rules.
It has not provided mandatory 15 % amenity spaces under DC Rules.
Page ... provided site margin as per the As per the information
DC Rules provided by PMC
that site margin at project
site is provided
recreational purpose as per Supreme Court are applicable to the
the DC Rules on virgin land as project commenced on or after the
Judgment ... provided Marginal Respondent No.7/PP have
Space as per the DC Rules and obtained necessary approvals and
turning radius of 9 Mtrs. for fire
amenity space, as developed project as per the proposal
per DC rules, not provided 10 % drawings approved by them. All open
open space on virgin ... thereby in
over to PMC, not developed conformity with the DC Rules (1987) and
green belt area of 3000 sqm as their own circular
Applicant Society members & residents. As per the prevalent DC
Rules, the Amenity Plot is meant for the Public Interest only. In
this case ... Appeal before UD
Minister under Section 47 of MRTP Act, DC rules for newly merged
villages in PMC, sanctioned on 6/12/2007, were
provided site margin as per the DC Rules.
kk. PP has not provided mandatory 15% amenity space under DC Rules ... officials and
1:10, site margin not as per DC projectproponent informed that ramp slope
rules. and site margin were as per prevailing rules
above said area statement is not as per the prevailing DC Rules of
Municipal Corporation of Greater Mumbai (MCGM).
4. The Project Proponent has made ... provided
requisite open space for recreational ground as per the DC rules.
About 150 M2 area is shown in the sanction plan for recreation
ground
stated earlier. All
other changes were approved under MRTP Act and DC Rules, for the last
building C, which also was started on 15.07.2014. Therefore ... professional Architect, which were in accordance with
the MRTP Act and DC Rules and the permissible FSI was used as allowed.
15. It is further
stated earlier. All
other changes were approved under MRTP Act and DC Rules, for the last
building C, which also was started on 15.07.2014. Therefore ... professional Architect, which were in accordance with
the MRTP Act and DC Rules and the permissible FSI was used as allowed.
15. It is further
developed
the 10% open space as per the DC Rule; PP has not provided the ramp
slope in the ratio of 1:10 as mandated ... DC Rules of MCGM; PP has not
provided site margin as per the DC Rules of MCGM; PP has not provided
fire and safety system