plea of the petitioners/tenants is as follows:
(i) The demolition plan obtained by the 1st respondent/landlord has
expired.
(ii) The landlord ... demolition plan into execution by
demolishing the upper floor.
(iii) Considering the age of the building, demolition of the upper
floor would affect the building
that though the landlords have obtained the necessary permission and sanctioned plan for demolition of the existing structure, that by itself does not indicate that ... building. Therefore, merely because a plan for reconstruction has not been obtained in addition to the sanctioned plan for demolition it is not possible
force.
2) The Local Body/Greater Chennai Corporation to
approve the demolition plan within 10 days from the date of
application.
3) The appellant must ... rectification, as per
approved demolition plan and to submit Planning Permission
Application as per site condition.
4) After demolition, fresh approval must be obtained
current rules in force.
ii. The Local Body to approve the demolition
plan within 10 days from the date of
application.
iii. Chennai Metropolitan Development ... 6348/2020
as also the master plans, zonal development plans,
sanctioned plans etc., have received encouragement
and support from the State apparatus. As and when
agreement, the plaintiffs had applied to the
Corporation of Chennai for demolition plan and also for Planning Permission
and permit for re-construction ... plaintiffs have duly
demolished the existing building as per the demolition plan obtained by
them from the Corporation of Chennai. Since the plaintiffs have committed
regards the averment in paragraph 8, he would submit that the demolition plan was sanctioned by the Corporation of Chennai on 15.02.2012 vide ... time of inspection. He would further submit that the demolition plan was sanctioned by the Corporation of Chennai on 15.02.2012 and action was taken
current
rules in force.
ii. The Local Body to approve the demolition plan
within 10 days from the date of application.
iii. The Local Body ... must de-seal the building after
approval of demolition plan for a period of
three months and to examine the site condition
with respect
current rules in force.
ii. The Local Body to approve the demolition plan
within 10 days from the date of application.
iii. The appellant must ... carry out the rectification, as
per approved demolition plan. After demolition, fresh
approval must be obtained, if the building remains different
from earlier approval
current rules in force.
ii. The Local Body to approve the demolition plan within 10 days from
the date of application.
iii. The Local Body ... Metropolitan Development Authority
must de-seal the building after approval of demolition plan for a
period of three months
corporation states that the rules
contemplate submission of a demolition plan. Such a demolition plan shall be
submitted by the petitioner well in advance ... demolition plan to be
submitted by the petitioner shall be endorsed and approved by the first
respondent with or without modification. But the approval shall