operator, or the entity developing the tramway system may, subject to the terms and conditions of the order or the agreement, use the tramway system
holder/Land owner/Association/Society/ Colony developer is required to furnish copies of the sale deed/title deed. Agreement of sale or General Power
registered agreement entered between the owner of the property and the builder shall be submitted. In case of any changes in the agreement ... local authority and provide all regular service connections. (f) Contractor / Builders / Developer / Owner shall submit All Risks Insurance Policy for the construction period
area and shall be planned and developed in cases where the units are above 100 in number and not be part of the residential blocks ... width with 2-lane black-topped is to be developed on any one side at the periphery/ as per suitability and feasibility for the convenience
built up area and shall be planned and are required to be developed in cases where the units are above 100 in number ... meters width with 2-lane black-topped is to be developed on any one side at the periphery/ as per suitability and feasibility
total built up area and shall be planned and developed in cases where the units are above 100 in number and not be part ... width with 2-lane black-topped is to be developed on any one side at the periphery/as per suitability and feasibility for the convenience
develop a project; OR (e) a Linkage Infrastructure project with the concerned developer of Mega Infrastructure Project; (ii) In case a developer is selected through ... motu proposal and the Concession Agreement. The suo-motu proposal and the Concession Agreement prepared by the Original Project Proponent shall be the property
Commissioner" means the Commissioner of APICDA; (f) "Concession Agreement" means the contract/agreement entered into between the Concessionaire and the APICDA or any entity created ... Concessionaire" means a private sector participant with whom a Concession Agreement is entered into by APICDA; (h) "Development", with its grammatical variations, means the carrying
Rules, 2017
8. Implementation And Monitoring.
- 8.1. Implementation Period : The Allottee shall develop the Land allotted to it including achievement of milestones or phase-wise ... development, if any, within the stipulated time period/s mentioned in the Agreement to Lease or Agreement for Sale or sale deed, as the case
road of 12m width with 2-lane black-topped is to be developed within the applicant's site on any one side at the periphery ... loop road would be allowed. All internal roads and pathways shall be developed with good design, practises, good built environment and standards. (m) Road requirements