More ever, it is apparently fabricated documents
prepared after survey proceeding bearing no inward / outward dispatch
number and office stamp.
8.1 We have gone through ... More ever, it is apparently fabricated documents prepared after survey
proceeding bearing no inward / outward dispatch number and office
stamp. In point
damage:-
"Attributed Cause of Damage: The container were already dispatched before our survey, however the packing and covers of the parts in the consignment
Lease I').
3. Another extent of 0.578 hectares in the same survey number of
same village was also granted to petitioner for 10 years ... based on the same, dispatch permits had been issued by the
4th respondent. He contended that the Surveyor, who surveyed the
area on ground
Lease I').
3. Another extent of 0.578 hectares in the same survey number of
same village was also granted to petitioner for 10 years ... based on the same, dispatch permits had been issued by the
4th respondent. He contended that the Surveyor, who surveyed the
area on ground
Lease I').
3. Another extent of 0.578 hectares in the same survey number of
same village was also granted to petitioner for 10 years ... based on the same, dispatch permits had been issued by the
4th respondent. He contended that the Surveyor, who surveyed the
area on ground
Lease I').
3. Another extent of 0.578 hectares in the same survey number of
same village was also granted to petitioner for 10 years ... based on the same, dispatch permits had been issued by the
4th respondent. He contended that the Surveyor, who surveyed the
area on ground
respondent to the appellants immediately as required. The survey reports were dispatched at belated stage to the appellants and that does not amount to lodging ... survey was sought from railway authority as required loss in consignment during transit period occurred during loading and unloading of consignment. Therefore the survey reports
that on survey of the
goods received in Hong Kong the survey report dated 17.10.1995
M/s.Heinch Public Marine and Cargo Survey (HK) limited ... fraud played by the defendants 1 and 2 in procuring,
forwarding and dispatching goods contrary to and against the
specifications covenanted and contracted under
issuing dispatch permits for transportation of
mineral and excavated mineral barites over an extent of Ac.
109.87 cents in survey No. 1021/15 in Vemula
also submitted that these GTs
were imported from USA and were dispatched in
flange to flange assembled conditions and permission
for carrying such heavy equipments ... contractor was expected
to carry out the route survey for the timely supply of
equipments / materials before submitting his bid for the
project and agreeing