used or
facilitates abstraction, consumption of energy which is not
authorized by DVB for drawing electricity, the burden of proof
shifts on the consumer
project; (ii) location of hand pump/tube
well; (iii) letter to DVB for temporary electricity connection;
(iv) all architectural as well as structural designs. Vide