November 2007.
WP (Civil) No. 9340/2009 Page 2 of 36
The EIA Notification
3. On 14th September 2006 the MoEF issued the Environment Impact ... Assessment („EIA‟) notification under Section 3 (1) and Section 3 (2)
(v) of the Environment (Protection) Act 1986 („EPA‟) read with Rule
been granted to the Respondent No.4
in violation of the EIA notification of 2006 in an arbitrary manner
and it being contrary ... which the environmental clearance was challenged was that in
the summary EIA and the minutes of the meeting on MoEF website,
it is apparent that
English as well as the
local language along with Environmental Impact
Assessment (EIA). However, for pipeline project,
Environmental Impact Assessment report will not be
required ... project reports including Environment Impact Assessment Report
(hereinafter referred to as EIA Report, for short) and Environment
Management Plan (hereinafter referred
short), on
the basis of quashed Environmental Impact Assessment (EIA) Notification
dated 09.12.2016 by order dated 08.12.2017 passed by this Tribunal in
Original Application ... action against respondent No. 16 - Project Proponent, including
prosecution for violation of EIA Notification, 2006 and other applicable
pollution control laws; direct respondent
CECB in accordance
with the Environment Impact Assessment Notification, 2006 (for short,
EIA Notification, 2006), as amended, for conducting the hearing.
4. The respondent ... respondent No. 7 had submitted
draft Environment Impact Assessment (for short, EIA) report on
10.06.2021 before the respondent No. 3 and the application
judis.nic.in
5
to the employees of (EIC)/Export Inspection Agencies (EIA's)
as a special one-time offer on the following terms ... admissible under
the gratuity Rules of EIC/EIA;
(ii) Ex-gratia payment equivalent to 1 1/2
months emoluments (Pay+DA) for each completed
year
stop the mining as they were
conducting the same in violation of EIA Notification, 2006 without
obtaining Environmental Clearance (EC). After obtaining exhibit Annexure ... without obtaining Environmental Clearance (EC) which will be in
violation of EIA Notification, 2006. As EIA Notification, 2006 mandates
prior Environmental Clearance
unit until installation of pollution control machinery as
laid down in EIA report.
2. The facts of this appeal, in brief, are that ... village without having any prior EC as they were
erected while 1994 EIA notification was in force. The PIL was finally
disposed
attracting the prior Environmental Clearance as stipulated in the
EIA Notification, 2006 and the respondents have not obtained the
same which is a violation ... hostels for educational
institutions from obtaining prior Environmental Clearance under
the EIA Notification, 2006 subject to sustainable environmental
management. There was also a clarification issued
direct the
proponent to comply with the same including fresh
EIA based on prescribed ToR before taking a decision
for revival of the EC. However ... located in Bangalore.
7 He further points out that as per the EIA Notification,
2006, Regulation No.10, various steps have been described for
post