CHARGE
4. The charge against the accused Ram Prakash under Section
11 of Prevention of Corruption Act, 1988 and against accused M/s Megha
Engineering ... after the accused had handed over the
charge.
Ld. Counsel for accused M/s Megha Engineering &
Infrastructure Ltd. did not examine the witness despite
served, as Assistant Executive Engineer and in-charge
Executive Engineer in Agricultural Engineering Department, Tiruneveli, died,
due to being hit by Dhadar Express(Train ... Department.
7.
01.09.2014
Muthukumarasamy(deceased) assumed Additional charge of Executive Engineer,
Agricultural Engineering Department, as Sam Selvaraj(incharge) has gone under
Medical Leave
Principal In-charge, Gaya Engineering College, Gaya in
year 1992-94. He was found guilty of financial irregularities,
corruption, misappropriation and deviation of funds ... department in the capacity of the Special
Officer on duty, Gaya Engineering College, Gaya, before the
Khijarsarai Police Station. The S.H.O. registered
branch of subjects.
P.W.4 Dr.V.Chitra was in charge of Engineering subject. She stated during the
course of her evidence, the scheme ... notice of this Court that, to get a pass mark in an engineering subject, a student
has to get minimum of 50 marks
PROSECUTION EVIDENCE
4. To connect the arraigned accused persons with the offences
charged, the prosecution in total has examined twelve witnesses viz
Sh. Keshav Chandra ... Delhi as PW9, Sh. Tilak Raj Magon, Director M/s Ambica
Engineering Pvt. Ltd. as PW10, Sh. Radhey Shyam,
Superintendent Engineer, Delhi
accused M/s. Reliance Engineering Works, for
construction of storage tanks.
12. It is further stated in the charge sheet that the balance amount ... even as per the charge
sheet, the said order was placed on M/s. Swastika Engineering.
25. The Ld. Defence counsel has also argued that
Loha Mandi,
Naraina,Delhi28. During investigation the said firm Ramesh
Engineering Works was found to be a fictitious and nonexisting firm ... issued by R
C Luthra as prop of Ramesh Engineering works.
CHARGE
26 Copies required U/S 207 Cr P C supplied to accused.
After
superintending
Engineer (E&M) in the public Health Engineering Department
was issued a charge-sheet on 16.11.94 which was challenged
deci-
sion, the Zones were created and Engineering Services in
each Zone were placed under the charge of a Chief Engineer,
of that Zone. Chandigarh
Town Division of Tata Steel later became JUSCO and
Town Planning and Engineering was part of Town Division of M/s
Tata Steel. TPE headed ... Khan the then Profession In-Charge, Civil Works, NIT,
Jamshedpur (ii) K.N. Jha, Chief Planning Engineering and
Construction, M/s JUSCO, Tata Steel, Jamshedpur