detailed examination and investigation, and have
been declared as dangerous. Despite extensive repair work, the degeneration
and dilapidation of the structures could not be prevented ... same was not
suitable for habitation.
16.2 Even though extensive repair work was carried out pursuant to report
of NCCBM, the problem persisted. Thus, upon
detailed examination and investigation, and have
been declared as dangerous. Despite extensive repair work, the degeneration
and dilapidation of the structures could not be prevented ... same was not
suitable for habitation.
16.2 Even though extensive repair work was carried out pursuant to report
of NCCBM, the problem persisted. Thus, upon
detailed examination and investigation, and have
been declared as dangerous. Despite extensive repair work, the degeneration
and dilapidation of the structures could not be prevented ... same was not
suitable for habitation.
16.2 Even though extensive repair work was carried out pursuant to report
of NCCBM, the problem persisted. Thus, upon
detailed examination and investigation, and have
been declared as dangerous. Despite extensive repair work, the degeneration
and dilapidation of the structures could not be prevented ... same was not
suitable for habitation.
16.2 Even though extensive repair work was carried out pursuant to report
of NCCBM, the problem persisted. Thus, upon
however in 2018, PW2 specifically stated that building requires comprehensive
and extensive repairs of all the wall, roof and structure which is not possible
while ... before signing the report. Nevertheless, the MCD report
also states that extensive repairs is needed. As opposed to AE, MCD, PW2 and
PW3 themselves visited
further claim of the petitioners that the
building, which has been extensively repaired prior to 15
years, is not at all in a dilapidated condition
further claim of the petitioners that the
building, which has been extensively repaired prior to 15
years, is not at all in a dilapidated condition
held that the expression
"current repairs" in Section 10(2)(v) was restricted
to petty repairs only which are carried out
periodically ... furniture, new
sanitary fittings and new electrical wiring were
installed besides extensively repairing the structure
of the building. By no stretch of imagination
space over the years. Due
to its extensive usage the building has been deteriorating and requires
repairs, including re-tiling of the entire terrace ... water and sewage lines. Due to the
urgent nature of extensive repairs required, the tenanted premises have been
rendered uninhabitable and extremely dangerous for residential
stay-in- strike, the workmen had
resorted to sabotage activities like causing
extensive damage to plant and machineries,
setting fire to corrugated boxes ... needless to say that the machineries now
cannot be used without extensive repairs
which again will involve huge expenses.
b) Finished products could