memo was to ascertain
"Nature, Composition, Description of Goods, Initial Boiling Point, Final
Boiling Point, Percentage of Volume (including losses) Distillation at
210c Flash ... boiling point, 300 252
degree C, Max
D) Dry Point, degree C - 250
3. Flash Point (Abel), degree 35 44
C, Min.
4. Smoke Point
Flash Point = 46oC
iv. Acidity (inorganic) = Nil
v. Smoke Point = 23 mm
vi. Ash Content = Nil
vii. Initial Boiling Point = 150.08oC
viii. Volume distilled ... More than 40%
ix. 90 % Distilled at = 236.02oC
x. Final Boiling Point = 248.9oC
16.1.2. The Appellant submits that the aforesaid reliance placed
Flash Point = 46oC
iv. Acidity (inorganic) = Nil
v. Smoke Point = 23 mm
vi. Ash Content = Nil
vii. Initial Boiling Point = 150.08oC
viii. Volume distilled ... More than 40%
ix. 90 % Distilled at = 236.02oC
x. Final Boiling Point = 248.9oC
16.1.2. The Appellant submits that the aforesaid reliance placed
that the Learned
Adjudicating Authority merely relied upon 2 parameters namely, Final Boiling
Point (Maximum) and Flash Point (Minimum) to hold that goods are Superior ... parameters (Distillation, Flash Point and Smoke
Point). Out of this, Learned Adjudicating Authority has cited only 02
Parameters (Final Boiling Point and Flash Point
under:-
"1. Density, distillation recovery
percent by volume, initial boiling point, final
boiling point, quantum of residue on
evaporation and UV Spectrophotometric
method indicates
following parameters were
tested:
"Initial Boiling Point : 135 Degree Celsius
Final Boiling Point : 234 Degree Celsius
Density at 15 Degree Celsius ... Final boiling
point, 0C, Min
vi) Flash point (Abel), 0C, 35 P:20
Min
vii) Smoke Point, mm, Min 18 P:31
viii) Total, sulphur
Final boiling 300˚ C 254˚ C 244˚ 242˚ C 249.5˚ 200
point ˚C, Max C C
vi) Flash Point ... been tested as 23 - 29 for the goods imported. The final boiling
point for Kerosene is 300˚ C and 200˚for LAWS. The test results
fuel for generation of steam for running the
turbine and for boiling the juice for the manufacture of sugar.
Turbine generates electrical energy which ... Furthermore, bagasse is used a fuel in the
factory for manufacture of final product and no specific input is
used up t the stage
National Green Tribunal Southern Zone vs The Chief Secretary To Govt. Of ... on 25 January
previous cases.
8. Since the pleadings are effectively complete, the matter
was finally heard, with the consent of the counsels of both
the parties ... both the parties, for keeping
their arguments succinct and to the point, and for resisting
the temptation to recant the entire history of the matter