Search Results Page

Search Results

21 - 30 of 37687 (0.58 seconds)

Vikrant Tongad vs State Of Uttar Pradesh on 21 May, 2025

drainage system may result in storm peak attenuation and thus diminishing the flooding of city area. This may require preparation of the Drainage Plan ... pumping arrangement is available that becomes dysfunctional during rains leading to flooding of areas. Also, often outfall drains are not designed appropriately to effectively discharge
National Green Tribunal Cites 30 - Cited by 0 - Full Document

Vikrant Tongad vs State Of Uttar Pradesh on 21 May, 2025

drainage system may result in storm peak attenuation and thus diminishing the flooding of city area. This may require preparation of the Drainage Plan ... pumping arrangement is available that becomes dysfunctional during rains leading to flooding of areas. Also, often outfall drains are not designed appropriately to effectively discharge
National Green Tribunal Cites 30 - Cited by 0 - Full Document

Manoj Misra vs Union Of India on 6 July, 2020

floodplains (II) DDA and Demarcation of the Flood Plains and Conservation Activities: 1. Demarcation: NGT may consider directing that the area Chief Engineer undertakes foot ... recommended that NGT directs the DDA to certify that there are now no portions of the flood plains outside CCTV or security coverage
National Green Tribunal Cites 14 - Cited by 0 - A K Goel - Full Document
Previous   1 2 3   4 5 6 7 8 9 10 Next