Engineer shall immediately inspect the site and if feels issuing necessary directions for flood fighting works on a small scale he shall immediately intimate ... Superintending Engineer shall immediately inspect the site and take direct control of the flood fighting works under intimation to Chief Engineer/Headquarter. In the event
immediate report of inundations, which include floods and storm-waves, and of droughts, which is directed by paragraph just above, other calamities, such as earthquakes
Flood Protection (Betterment Contribution) Act, 1959. No. ........................ - In pursuance of the Explanation 2 to Section 3 of the Bihar Irrigation and Flood Protection (Betterment Contribution ... hereby pleased to direct that the ............. day of ...................... 19 ................ shall be the date of completion of ............... the following irrigation work/flood-protection work/part
executed on the holding, is either executed directly for its benefit or is after execution, made directly beneficial to it. (ii) Until the contrary ... irrigation; (c) drainage, reclamation from rivers or other waters, or protection from floods or from erosion or other damage by water, or land used
takes; (k) proposals for irrigation, water-supply and hydro-electric works, flood control and prevention of pollution of river and other sources of water supply ... allotment in any area; (m) recommendations to the State Government regarding the direction to be issued to the local authorities in the region and different
from an irrigation work and normally does not irrigate the fields directly; (ii) "Branch Canal", which branches off from main canal and feeds the distributaries ... branch canal may not irrigate the field directly; (iii) "Distributary/Sub-distributary," which takes off directly from main canal or branch canals or a larger
urgency. - (1) In cases of urgency whenever the appropriate Government so directs the Collector, though no such award has been made, may on the expiration ... becomes necessary for the purpose of protecting life or property from flood, erosion or other natural calamities or for the maintenance of communication other than
sanctioned work" means a proposed work in respect of which a direction that it shall be executed has been issued under sub-section ... locality, or (iv) any work for the prevention or control of flood, should be constructed, improved, repaired or maintained, the [Provincial] [Substituted
channel" means any channel by which water is led from a canal directly into the fields to be irrigated, and includes all subsidiary works connected ... does not include works for the removal of sewage from towns: (4) "flood-embankment" means any embankment constructed or maintained by the [servants
Safety Organization or the Dam Safety Cell of the Organization will report directly to the Highest Engineering/Technical Authority of Water Resources Department of State ... monsoon, post-monsoon inspection and also special inspections during and after floods, earthquake and if any sign of distress or peculiar behaviour is noticed