classification by carrying
out field survey and to furnish report with detailed FMB Sketch.
8. Accordingly the Deputy Director, Town and Country Planning,
Tirunelveli ... been requested to take action to furnish the report
with detailed FMB sketch of the site to ascertain the exact CRZ
area/zone vide
same was not available as it was not
traceable. As the FMB Book of Naduvakkarai Village could not be traced,
a Joint Inspection was carried ... present the applicant fixing their Northern boundary with available
latest documents as FMB, Block Map & Patta which lies along the middle
portion
nallah passing through the project area have
been verified with revenue authorities / FMB and observed that the existing natural seasonal
drains have not been realigned ... project area
preservation and protection. have been verified with revenue authorities / FMB and
observed that the four existing natural seasonal drains /
oddais in the project
Historical Research with a request to send the
Field Measurement Book (FMB) in respect of Survey. Nos. 249, 250 and
251 of Naduvakkarai village pertaining ... ascertain the nature of the
land in respect of the missing FMB Sketch of the Survey Numbers
mentioned in the report and also examine
depth of mining to be carried out was not specified, however
FMB sketch demarcated the safety distance for quarrying of rough stone and gravel ... depth of mining to be carried out was not specified, however,
FMB sketch demarcated the lease granted area for quarrying of rough stone and gravel
nallah passing through the project area have
been verified with revenue authorities / FMB and observed that the existing natural
seasonal drains have not been realigned ... through the project area have
requires preservation been verified with revenue authorities / FMB
and protection. and observed that the four existing natural
seasonal drains / oddais
Suo Motu vs The Principal Secretary on 31 January, 2022
Bench: K Ramakrishnan , K. Satyagopal
survey should be undertaken in reference to the
village Field Measurement Book (FMB) sketch map.
2. To obtain an amended EC from the MPSEIAA
survey should be undertaken in reference to the
village Field Measurement Book (FMB) sketch map.
2. To obtain an amended EC from the MPSEIAA
survey should be undertaken in reference to the
village Field Measurement Book (FMB) sketch map.