Search Results Page

Search Results

1 - 10 of 1013 (1.06 seconds)

Section 5 in Central Electricity Regulatory Commission (Fees and Charges of Regional Load Despatch Centre and other related matters) Regulations, 2019 [Entire Act]

network after tripping (xiii) Rescheduling of generation (xiv) Reporting of a grid disturbance (GD)/grid incident(GI) (xv) Periodic communication with stakeholders and sensitizing ... Frequency Oscillations (LFO) monitoring and analysis (vi) Detailed reports of Grid Disturbances/Grid Events (vii) Simulation of events and learnings thereof (viii) Event replay, lessons
Union of India - Section Cites 0 - Cited by 0

Section 7 in The Central Electricity Regulatory Commission (Indian Electricity Grid Code) Regulations, 2010 [Entire Act]

Section 7 in The Central Electricity Regulatory Commission (Indian Electricity Grid Code) Regulations, 2010 (7) If any dispute arises with reference to the quality ... basis; (b) Scheduling/ re-scheduling of generation; (c) System restoration following grid disturbances; (d) Metering and data collection; (e) Compiling and furnishing data pertaining
Union of India - Section Cites 0 - Cited by 0

Madhya Pradesh Electricity Grid Code (Revision-II), 2019

propose any revision, if necessary, in the Grid Code consequent of analysis report on major grid disturbance soon after its occurrence. The recommendations ... state grid entities. (i) Review the reactive compensation in the State Transmission System and distribution network. (j) Review and analyze the grid disturbances and system
State of Madhya Pradesh - Act Cites 0 - Cited by 0
1   2 3 4 5 6 7 8 9 10 Next