Search Results Page

Search Results

1 - 4 of 4 (0.44 seconds)

Section 0 in Petroleum and Natural Gas Regulatory Board (Technical Standards and Specifications including Safety Standards for Liquefied Natural Gas Facilities) Regulations, 2018 [Entire Act]

rupture disc integrity should be provided. Fragments of the rupture disc should not fall into the tank; b) Failure of the rupture disc shall trip ... with cut off shall be provided. The high - high level should be hard wired directly to close the liquid inlet valves to the tank
Union of India - Section Cites 0 - Cited by 0
1