released by the Hon'ble Court obtaining an
affidavit and trial continues in due course. This is a practice not only
in Prayagraj ... mining with the following recommendations to remedy
the situation:
Installation of CCTV Cameras should be at mining points to
verify the amount of sand extracted
Sahebganj in the meeting
cameras must be dated 25/01/2023 has informed that
installed at all the the PTZ cameras have been installed
stone ... crusher unit has installed the
PTZ cameras shall be
PTZ camera.
shared with the JSPCB.
3. JSPCB has requested the Director
General, National Informatics Center
Sahebganj in the meeting
cameras must be dated 25/01/2023 has informed that
installed at all the the PTZ cameras have been installed
stone ... crusher unit has installed the
PTZ cameras shall be
PTZ camera.
shared with the JSPCB.
3. JSPCB has requested the Director
General, National Informatics Center
Sahebganj in the meeting
cameras must be dated 25/01/2023 has informed that
installed at all the the PTZ cameras have been installed
stone ... crusher unit has installed the
PTZ cameras shall be
PTZ camera.
shared with the JSPCB.
3. JSPCB has requested the Director
General, National Informatics Center
meeting dated
25/01/2023 has informed that the FTZ
cameras must be installed cameras have been installed at the five
check posts ... earliest, so that the
feed of the FTZ cameras installed by the
cameras shall be shared
stone crushing units should be shared with
with the JSPCB
with the UPPCB on
15.03.2024 and the trial run of the unit was allowed by the UPPCB from
15.03.2024 and that till the date ... extending the time
of trial run by a further period of two weeks. The inspection of the unit
during the trial run period has been
with the UPPCB on
15.03.2024 and the trial run of the unit was allowed by the UPPCB from
15.03.2024 and that till the date ... extending the time
of trial run by a further period of two weeks. The inspection of the unit
during the trial run period has been
with the UPPCB on
15.03.2024 and the trial run of the unit was allowed by the UPPCB from
15.03.2024 and that till the date ... extending the time
of trial run by a further period of two weeks. The inspection of the unit
during the trial run period has been
with the UPPCB on
15.03.2024 and the trial run of the unit was allowed by the UPPCB from
15.03.2024 and that till the date ... extending the time
of trial run by a further period of two weeks. The inspection of the unit
during the trial run period has been
with the UPPCB on
15.03.2024 and the trial run of the unit was allowed by the UPPCB from
15.03.2024 and that till the date ... extending the time
of trial run by a further period of two weeks. The inspection of the unit
during the trial run period has been