said
sanctioned load. The plaintiff declared his connected load in
voluntary disclosure scheme 1995 as 14.92 KW and deposited the
required charges for replacement ... sanctioned load. The plaintiff declared his connected load in
voluntary disclosure scheme 1995 as 14.92 KW and deposited the
required charges for replacement of meter
said
sanctioned load. The plaintiff declared his connected load in
voluntary disclosure scheme 1995 as 14.92 KW and deposited the
required charges for replacement ... sanctioned load. The plaintiff declared his connected load in
voluntary disclosure scheme 1995 as 14.92 KW and deposited the
required charges for replacement of meter
Counter Claim no.96/14
parking, X-ray, loading charges and terminal charges at the origin airport
(Bangaluru), defendant no.1 has never denied payment
Counter Claim no.96/14
parking, X-ray, loading charges and terminal charges at the origin airport
(Bangaluru), defendant no.1 has never denied payment
State vs . 1. Ashok Kumar Goel (Since Deceased) on 11 July, 2014
IN THE COURT
detained
when he was in the process of loading consignment.
One of the charges framed against the accused
which the consignment was loaded and used those forged documents as
genuine. Charges under Section 468 / 471 IPC read with Section 34 IPC were
also ... Page 2 of 18
Delhi. On 26.12.1996, Sh. Ravinder Sharma (PW-15), Loading Clerk of the
company, accompanied the driver (accused Mahinder) of the truck
that they used to pay
electricity charges to them. Both the accused further answered that the
load report is false and highly exaggerated and that
premises no. 3407. It is the plaintiffs' case that the sanctioned load of 2KV has
been given in both the connections and the plaintiffs ... they were paying the electricity charges regularly as per
consumption. The plaintiffs aver that the connected load has been
exaggerated by the defendant
committing theft of electricity
and that he was paying electricity charges to the landlord as per
consumption recorded in subĀmeter, which was installed ... collected rent and
electricity charges from him, which he further paid to the landlord.
Accused further answered that the load report was not prepared