found working with connected load of 191.05 HP as against the
sanctioned load of 139.5 HP and hence, the compensation charges for
the additional connected ... charges for violations and in view of the facts involved in this case
whereby compensation charges and surcharge was levied for additional
connected load, over
load utilized was 2.47 KW instead of the
permitted and sanctioned load of 0.906 K.W. Thus the petitioner has
utilized the excess load over ... recorded in the electronic meter and
thereafter, the excess demand/load charges have been paid at the
minimum charge of Rs.100 per kilowatt
quoted above, that such
separately fixed price of freight or charges for delivery should not be
included in the price of goods is a question ... been done in the present case like
price for Gypsum, freight charges and loading and stacking charges
will not be material, insofar as the question
outstanding detention charges?
6) Whether the Claimant is entitled to claim the
detention charges prior to 31.03.2010, when the loading of the
cargo commenced ... Whether the Claimant is entitled to claim the
detention charges prior to 31.03.2010, when the loading of the
cargo commenced on 30.03.2010 itself
present value of the dismantled and reusable materials
towards charges for dismantling and charges for loading, unloading,
transport to the new site / store.
iii. Cost ... consumer based on the actual cost of
materials, loading, unloading, transport and erection charges. If the
original estimate cost is more than the revised estimate
Sp.Chockalingam vs Principal Chief Conservator Of Forests ... on 7 January, 2019
Author: Chief Justice
Sp.Chockalingam vs Principal Chief Conservator Of Forests ... on 7 January, 2019
Author: Chief Justice
plaintiff was sanctioned with a load of 27 HP. The plaintiff is regular in
paying the consumption charges without any default. The average
consumption ... meter card directing the plaintiff to
pay Rs.25,186/- towards consumption charges for the period from
15th day of January to 15th
carrying capacity, overload,
freight' and other miscellaneous charges and if
overload, then the punitive charges would also be
shown. The RRs would be taken ... consignor copy
of the RR and would pay the freight charges and
punitive charges at the Ariyalur Station itself. The
payment is made either through
front of their respective shops and
collecting parking charges and entry fees for every vehicle with load. All of a
sudden, the respondents have prevented ... fixed different tariff/charges according to the size of
the vehicle entering into the premises. For parking different charges levied