premises on which the work shall be executed all scaffolding, surplus materials,
rubbish and all huts and sanitary arrangements required for his/their work people ... with the requirements of
this clause as to remove of scaffolding surplus materials and rubbish and all huts
and sanitary arrangements as aforesaid and cleaning
Engineer Incharge is authorized to require the contractor to return all surplus material over drawn by the contractor and in case of default, the contractor
unless the Contractor has removed from the premises, all the
scaffolding, surplus materials, rubbish and all huts and sanitary arrangement
that have been erected
Harihar International Pvt. Ltd. The said letter also shows that
surplus material belonging to Harihar International Pvt. Ltd.
for which Indian Oil Corp
method of, application
of, an insecticide and the disposal of surplus
material, washings and containers, following
application;
(z) the maintenance and inspection of records
method of, application
of, an insecticide and the disposal of surplus
material, washings and containers, following
application;
(z) the maintenance and inspection of records
method of, application
of, an insecticide and the disposal of surplus
material, washings and containers, following
application;
(z) the maintenance and inspection of records
method of, application
of, an insecticide and the disposal of surplus
material, washings and containers, following
application;
(z) the maintenance and inspection of records
method of, application
of, an insecticide and the disposal of surplus
material, washings and containers, following
application;
(z) the maintenance and inspection of records
method of, application
of, an insecticide and the disposal of surplus
material, washings and containers, following
application;
(z) the maintenance and inspection of records