effective from 1st October 1996. Amongst other
things, MSEB raised its maximum demand charge (per month) in respect of
stand-by facility / supply from
demand for the
power supplied to the Generating Company. In the bills
relating to the power supplied during the period, a permitted
maximum demand charge ... question of collecting maximum
demand charges as well as the development charges.
31. As stated above, the Maximum Demand Charges and
Development Charges were
Charge Rate × 80% of contract demand or
maximum recorded demand during the billing period (whichever is higher)
Demand Charge Rate × contract demand or maximum
recorded ... changed the formula to read as: "Demand Charges Rate X contract demand or maximum recorded demand during the billing period (whichever is higher
maximum demand charges for HT
supply shall be based on the actual
recorded demand at the point of supply
or at 90% of the demand ... case the maximum recorded
demand is in excess of the quota fixed,
the demand in excess of the quota fixed
shall be charged at rates
called
as demand charges (KVA Charge). The first charge depends on the
units of energy consumed by the consumer. The second charge is
Appeal ... maximum demand or
contracted demand, contracted by the consumer.
63. As per the prevailing tariff order in Tamilnadu, the HT consumers
are charged with
cent, i.e., the maximum is 13.25 per cent.
(ii) On demand loans, the maximum rate of interest varies from 13.75 per cent ... cent per annum
(iv) The maximum rate of interest charged on demand loans is 18 per cent per annum and minimum rate of interest ranges
Kumar City Residents Co-Operative ... vs Kumar Urban Development Pvt. Ltd. ... on 13 May, 2022
category. The
billing demand for HTSS category is considered as the
maximum demand recorded during the month or the contract
demand, whichever is higher ... other
categories, the billing demand is the maximum demand
recorded during the month or 85% of the contract demand
whichever is higher. The above
Appellant for demand charges wherein the
calculation has been made on the basis of the
maximum demand recorded in each 15 minutes
time block ... present demand charges being levied by the
Distribution licensee on the Appellant-2 on the basis
of the recorded maximum demand has rendered the
Open
inclusion of demand charges the Discom has
submitted that the maximum demand of the Appellant is recorded
in the overall maximum demand of the Discom ... maximum demand of a particular consumer in the
recorded overall maximum demand. The demand charges are
being considered in addition to energy charge while considering