sealed both sides i.e.
from Bengaluru to Davengere. He then checked back side luggage
body, it is noticed seal was missing towards platform ... seal in train No.283,
that he has also issued copy of seal memo as per Ex.p.37 to
provide tape seal from Arisekere
inspected on
23.07.2007, its display screen found missing. Meter box seal found
missing after open the box. Seal of the meter found missing and
paper ... Neeraj Kumar & Anr.
Page 10
meter box seal was found missing. Seal of the meter found missing
and paper seal is found tampered meter
During the inspection meter CT box seals,
meter box seal, terminal seal , meter Half RHS seal were found missing and
meter half LHS seal were ... inspection meter CT b ox seals, meter box seal,
terminal seal , meter Half RHS seal were found missing and meter half LHS
seal was found
after comparing the same with M.O-1 (Companys seal).
The seal was marked as M.O.-1 through ... hearing, it is noticed that M.O.-1 seal is missing from the file.
A perusal of the polythene cover in which the seal
thereafter, sent back. But there are no documents to
show how the seals were appended for the second time. In such a situation
otherwise also ... were not complied with. Link evidence in this case is missing.
Seal in question after use was never handed over to independent witness
team that meter box and meter terminal
seals were not existing, Lower LHS half seal found missing, one upper LHS
seals found broken ... that the
mater box and meter terminal seals were not existing, lower HS half seal
found missing, one upper LHS seal found broken
theft could be lodged against the petitioner on
account of missing of seals on the metering unit or tampered or breakage
of glass window. Accordingly ... said provision is applicable to the
cases cases of missing or tampering of seals on the meter or breakage of
glass window
checking, Assistant
Executive Engineer Flying Squad detected that meter cupboard seal was
missing. M&T seals were tampered with and were without spot welding
that the meter was burnt badly. The M.E. seals were missing,
accordingly, it was unfit for checking. Account of the complainant
overhauled and accordingly
with while the report of Nand Kishore says only terminal cover seal was missing. Thus, we find that the report prepared on 26.8.2009 lack confidence