which is abutting Varthur Main
Road is situate in the 'Mutation Corridor'. Hence, all
the land use as permitted under ... CORRIDOR'S
4.5.2) Regulations
i) Eligibility for the zone:
• Plots facing the corridors shall have a minimum
frontage of 12m.
• For 'Mutation Corridor
1573/A was abutting the road in front of the
mutation corridor, as per revised Master Plan of 2015.
16. Thereafter, during the pendency ... Master Plan-2015
ºÁUÀÆ Zoning Regulation ¥ÀæPÁgÀ ¸ÀzÀj ¤ªÉñÀ£ÀªÀÅ Mutation
Corridors ªÁå¦ÛAiÀİèzÀÄÝ, ¤AiÀĪÀÄUÀ¼À C£ÀĸÁgÀ ¥Àæ²ßvÀ ¤ªÉÃ
regard to the Master
Plan 2015 such as with respect to Mutation Corridors and
also learned counsel appearing in the other writ petitions
state that
M/S Enterprises Software Solutions Lab vs Muthuswamy on 22 September, 2017
Author: B.Veerappa
land is earmarked for
residential, partially industrial and mutation
corridor. Hence, the same could not have been
sanctioned for the purpose of establishing a
police
ROAD WHICH IS PREVAILING IN CDP
RMP 2015 (MUTATION CORRIDOR) AS THE PROPOSED ROAD IN RMP
2015 IS DROPPED IN THE PROPOSED ... prevailing in CDP RMP 2015 (Mutation Corridor) as
the proposed road in RMP 2015 is dropped in the
proposed CDP RMP 2031 (Annexure
agricultural zone and
since even the said extent fell within the mutation corridor
as contemplated in Regulation 4 .5 of the Zoning of Land
regard to the Master Plan 2015 such as with
respect to Mutation Corridors and also learned
counsel appearing in the other writ petitions state
Date
H2007', for short regulations, introduced a new
concept krwwn as Mutation Corridor, defining certain areas
U'?
of Bangalore city
also submitted
that the petitioner's land abuts the Mutation Corridor
and NH.7, the residential building would therefore, not
be conducive for residential ... take into consideration the fact that the scheduled
property abuts the Mutation Corridor and NH.7 and
also the fact that adjoining properties are being